Similar Projects
Front Street Townhomes
New Construction, Infrastructure
Conception
$23,000,000 CJ est. value
Manchester, NH 03102

Canal/Franklin/Main Street Intersection Improvements - City of Nashua
Infrastructure
Conception
Nashua, NH

Thomas More College of Liberal Arts Campus Improvements
Renovation
Design
Merrimack, NH 03054

Zachary Road / Warehouse Addition
New Construction, Infrastructure - 38,000 SF
Design
$4,000,000 CJ est. value
Manchester, NH 03109

Basketball Court at Riddle Brook School
Infrastructure
Bidding
$350,000 CJ est. value
Bedford, NH 03110

Crown Hill Pool Deck Repair
Infrastructure
Bidding
$200,000 CJ est. value
Nashua, NH 03060

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFP D/B - Design / Build Services for Addition/renovation of the Hudson Police Department
Addition, Demolition, Renovation, Infrastructure - 9,500 SF
Post-Bid
$5,900,000 CJ est. value
Hudson, NH 03051

Cleaning and Cement Lining of Distribution Water Main
Results
Manchester, NH

Site Improvements and MOV Canopy Construction
Infrastructure
Results
$960,000 est. value
Hillsboro, NH 03244

Gilbert Crossing Addition
Addition, New Construction, Infrastructure - 100,000 SF
Construction
$32,000,000 CJ est. value
Merrimack, NH 03054

Aroma Joes / Hudson
New Construction, Infrastructure - 900 SF
Pending Verification
$270,000 CJ est. value
Hudson, NH 03051

Second Street Office Building
New Construction, Infrastructure - 6,000 SF
Pending Verification
$1,200,000 CJ est. value
Hudson, NH 03051

Walnut Street /Chestnut Street /Central Street Oval Improvements - City of Nashua
Infrastructure
Conception
$501,422 est. value
Nashua, NH

Home2 Suites by Hilton / Bedford
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Bedford, NH 03110

Last Updated 09/26/2022 03:06 PM
Project Title

CSO Optimization With Real Time Controls

Physical Address View project details and contacts
City, State (County) Manchester, NH 03104   (Hillsborough County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,155,119 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Manchester is seeking prequalification statements from construction contractors for a pipeline cleaning and retrofit project: The Cemetery Brook CSO Optimization with Real-Time Controls (RTC) Project, Contract 1. The project is scheduled to begin construction in fall of 2022. The Cemetery Brook CSO Optimization with Real-Time Controls Project, Contract 1 includes cleaning and maintenance of the Valley Street Cemetery conduits, modification of the Cemetery Brook Primary CSO regulator, construction of a new Cemetery Brook dry weather flow regulator structure with local reactive passive control, and implementation of an extended reactive RTC at West Side Pump Station. Construction duration is 348 calendar days for substantial completion and 408 calendar days for final completion. The Cemetery Brook CSO Optimization with Real-Time Controls Project, Contract 1, takes place along approximately one mile of reinforced concrete storm drain and connect to the East Interceptor North (EIN). It includes the construction and installation of a new Dry Weather Flow (DWF) regulator structure with local reactive passive control at the outlet of Cemetery Brook's 30-inch DWF pipe, at a depth ranging from 15 to 25 feet. Contract 1 also includes raising the elevation of the 32-foot overflow weir crest of Cemetery Brook's Primary Regulator structure by 1.12 feet. Debris removal from the 1200 linear foot of 10' x 4' double box culvert at Valley Street Cemetery will also be required. Finally, the West Side Pump Station will be modified to incorporate extended reactive real-time controls (RTC). Mandatory pre bid conferences will be held approximately two weeks prior to bid opening. Construction contractors with extensive experience in sanitary and storm drain construction projects of a similar size and scope are invited to submit prequalification statements for bidding on the City of Manchester's Cemetery Brook Combined Sewer Optimization with Real-Time Controls Project, Contract 1. Prequalification forms for construction contractors may be obtained from Brown and Caldwell by contacting Colin O'Brien at cobrien@brwncald.com. Questions regarding the pre-qualification forms may also be directed to Colin O'Brien at the email address above or at (978) 906-1382. The right is reserved to waive any informalities in or reject any or all prequalifying Contractors and to accept prequalified Contractors that are deemed most favorable to the interest of the City of Manchester. Question Deadline 07/10/2022 at 4:00 PM ET please submit them via email to cobrien@brwncald.com

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents