Similar Projects
Last Updated | 10/05/2020 01:53 PM |
Project Title | Terminal Apron Reconstruction Phase 1 BP-1 |
Physical Address | View project details and contacts |
City, State (County) | Mobile, AL 36615 (Mobile County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Runways/Taxiways |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project consists of the full depth concrete apron reconstruction and associated drainage improvements at the Mobile Downtown Airport in Mobile, AL. The scope of work generally includes the installation of approximately 15,600 SYD of 16-inch Portland cement concrete pavement on a 6-inch lean concrete base course and select fill material, removal of existing concrete apron pavement, installation of Class V round drainage pipes, installation of new aircraft-rated drainage structures, pavement marking removal and installation, and all associated erosion and sedimentation control measures. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |