Similar Projects
Smith Academy For Excellence Renovation
Renovation - 60,000 SF
Design
$12,000,000 est. value
Fort Wayne, IN 46806

Indoor/Outdoor upgrades to South Dearborn High School - South Dearborn Community School
Renovation, Infrastructure
Design
$15,000,000 est. value
Aurora, IN 47001

South Henry School Corporation - 2000-3000 gallons of propane fuel
Infrastructure
Bidding
$274,950 CJ est. value
Straughn, IN 47387

New Albany High School Bleacher Storage
Renovation
Bidding
$150,000 CJ est. value
New Albany, IN 47150

Central Nine Career Center Improvements Multi Purpose Building & Welding Lab
Renovation, Addition - 19,500 SF
Post-Bid
$4,750,000 est. value
Greenwood, IN 46143

2022 Tennis Center Improvements at Rensselaer High School
Renovation
Post-Bid
Rensselaer, IN 47978

FWCS: CMc Services for Renovation, and Accessibility and Security Improvements
Renovation
Results
Fort Wayne, IN 46819

Lawrenceburg Community Schools BP #2
Renovation, Alteration
Results
Lawrenceburg, IN 47025

Community and Education Center and Hilltop PK and Preschool
Renovation, Addition - 68,050 SF
Construction
Less than $19,398,000 est. value
Indianapolis, IN 46200

East Washington Academy
Renovation
Construction
Muncie, IN 47305

2022 Bond Lebanon Community School Corporation
New Construction, Infrastructure
Pending Verification
$5,600,000 CJ est. value
Lebanon, IN 46052

RFP Design Architectural and Engineering Services for the Expansion and Renovation of Levan R. Scott Academy
Addition, Renovation, Infrastructure
Pending Verification
$670,000 CJ est. value
Fort Wayne, IN 46806

Security and Infrastructure Improvements at Lakeside and Northwood Middle Schools
Renovation
Design
$600,000 CJ est. value
Fort Wayne, IN 46802

Pool Masonry Repairs at New Albany High School
Renovation
Bidding
$200,000 CJ est. value
New Albany, IN 47150

Speedway High School Secure Front Entry
New Construction
Post-Bid
Indianapolis, Speedway, IN 46224

Last Updated 06/26/2023 09:03 AM
Project Title

2024 Air Handler Replacement Pike Central High School

Physical Address View project details and contacts
City, State (County) Petersburg, IN 47567   (Pike County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Any bids received after the designated time will be returned unopened. Bids shall be delivered in sealed envelopes bearing the name and address of bidder and indicating identification of the project. B. The term Project as used herein shall refer to: 2024 Air Handler Replacement Pike Central High School Petersburg, Indiana C. The term Owner as used herein shall refer to: Pike County School Corporation Attn: Mr. Todd Harker 211 South 12th Street Petersburg, IN 47567 D. The term Architect as used herein shall refer to: Hafer Suite 800 21 Southeast Third Street Evansville, Indiana 47708 E. Proposals for the work as indicated on the contract documents will be received as follows: Unified Bid Package: Base Bid shall include general construction, mechanical construction and electrical construction. F. Construction shall be in full accordance with the Bidding Documents, which may be examined by prospective bidders at the following location: Hafer 21 SE Third Street, Suite 800 Evansville, Indiana 47708 If your company is not currently registered, you may do so by clicking "Register for an account". a. Amount of the deposit for up to three sets of bidding documents may be refunded in full when the Plans and Specifications have been returned to MACO - Evansville Blue within ten (10) days after time set for receiving bids and in good re-usable condition. If the Plans and Specifications are returned after this ten (10) day period or in unusable condition, the deposit will be forfeited. b. One (1) set of bidding documents consists of one (1) Project Manual and one (1) Complete Set of Drawings. H. After award of contract, the contractor shall be furnished with FOUR (4) sets of plans and specifications. I. A bid may not be withdrawn for a period of sixty (60) days following the time and date designated for the receipt of bids. J. All work shall meet requirements of the drawings, specifications and other Contract Documents prepared by Hafer. K. Costs for Performance and Labor and Material Payment Bond SHALL BE included in the contractor's bid. L. Subcontractor and Materials List: The bidder shall include with the Proposal Form the subcontractors and major material suppliers which the bidder will be using on the project. Once submitted, the bidder may not change a proposed subcontractor without Owner approval. Bidders should submit the Subcontractor/Material Supplier List with their bid. N. Bid Security - A Bid Bond or other form of bid security in the amount of 5% of the total bid IS REQUIRED. O. Provide Indiana State Form 96 and Financial Statement with Bid Proposal. P. Owner reserves the right to reject any and all bids and waive any and all informalities, whether or not the Bids comply with the prescribed requirements, and alternates and unit prices if requested in the Bid Forms. It may consider the qualifications and experience of Subcontractors and other persons and organizations (including those who are to furnish the principal items of material or equipment) proposed for those portions of the work for which the identity of Subcontractors and other persons and organizations must be submitted as specified in the "Information for Bidders". It may conduct such investigations as it deems necessary to establish the responsibility, qualifications and final ability of the bidders, proposed Subcontractors and other persons and organizations to do the work in accordance with the Contract Documents to Owner's satisfaction within the prescribed time. Owner reserves the right to reject the Bid of any Bidder who does not pass any such evaluation to Owner's satisfaction. Q. Each bidder shall visit the site of the proposed work and become fully acquainted with conditions as they exist so the Bidder may fully understand the facilities, difficulties, and restrictions related to the execution of the work under contract. Bidder shall also thoroughly examine and be familiar with the Drawings and Project Manual. Failure or omission of any Bidder to receive or examine any form, instrument or document or to visit the site and to become acquainted with existing conditions shall in no way relieve the Bidder from any obligation with respect to the Bidder's Bid Proposal. R. The Architect shall not be responsible for oral, telephonic instructions or any other verbal explanations or interpretations of the Construction Documents. Every request for such interpretation shall be made in writing and addressed and forwarded to Ron Steinhart, Hafer, 21 SE Third Street, Suite 800, Evansville, IN 47708. No inquiry received within 5 days of the date fixed for opening of the Bids will be given consideration. Every interpretation made to a Bidder shall be in the form of an Addendum to the Contract Documents which, if issued, shall be sent as promptly as is practical to all persons to whom Contract documents have been issued. All such Addenda shall become part of the Contract Documents and must be acknowledged on the Bid Proposal Form as having been received and included as part of the Bid Proposal. The Work consists of the following: 1. Replace 3 air handlers and all associated work outlined in construction documents. 2. Contract Documents, dated April 2023 were prepared for the Project by Hafer

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents