Similar Projects
Last Updated | 02/16/2023 01:12 AM |
Project Title | RFP Engineering - Professional Design Services CTH D Root River Tributary Structure CTH T Pewaukee River Tributary Structure |
Physical Address | View project details and contacts |
City, State (County) | Pewaukee, WI 53051 (Waukesha County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected March 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Waukesha County Department of Public Works is interested in obtaining the services of an engineering consulting firm for the facility development process resulting in the design and preparation of preliminary plans, final plans, and PS&E documents, reports and other related documents needed for the replacement or perpetuation of the CTH D Structure within a Root River Tributary and the CTH T Structure within a Pewaukee River Tributary. The project sites are located in the City of New Berlin, the City of Waukesha and the City of Pewaukee. The structure may be one (1) or more spans as determined by hydraulic modelling. The CTH K roadway will remain two (2) lanes with 10-foot shoulders. New beam guard placement shall be investigated, however if there is available clear zone new beam guard may not be necessary. The new structure shall convey the 50-year return interval discharge with a check on the 100 year return interval to check on roadway overtopping. The backwater shall not be raised more than 0.01 feet for any structure selection. Land acquisition is not anticipated for completion of this project, however; additional right of way or easements will be acquired, if needed. Questions Due: Feb 23rd 2023, 4:30 PM CST Amendment Issued: 2/27/23 by 4:30 p.m. CST/CDT Finance Committee Approval: Wednesday, 4/19/23 Contract executed: Approximately 4/26/23 The method of contractor selection has not been determined at this time. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |