Similar Projects
RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

Dog Exercise Area Site Improvements at Duck Farm Forest Preserve
Infrastructure
Design
$3,000,000 CJ est. value
Lindenhurst, IL 60046

Forest Park Bluff Stabilization
Infrastructure
Bidding
$500,000 CJ est. value
Lake Forest, IL 60045

Forest Park Bluff Stabilization
Infrastructure
Bidding
$500,000 CJ est. value
Lake Forest, IL 60045

Yellow Markings on HMA Highways and Add Hot Spray Thermoplastic Pavement Markings
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Waukegan, IL 60085

Yellow Markings on HMA Highways and Add Hot Spray Thermoplastic Pavement Markings
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Waukegan, IL 60085

2021 Curb and Sidewalk Program
Post-Bid
Grayslake, IL

2021 Crestfield Subdivision Resurfacing
Post-Bid
Indian Creek, IL

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Mill and Resurface Pavement
Results
Less than $2,965,213 est. value
Libertyville, IL

Navyseum Development
New Construction, Infrastructure
Design
$43,000,000 CJ est. value
North Chicago, IL 60088

Edina Park Bike Trail
Infrastructure
Bidding
$265,000 CJ est. value
Zion, IL 60099

Asphalt Roadway
Post-Bid
Deerfield, IL

2021 Roadway Improvements
Results
IL

Park District Maintenance Facility
Infrastructure, Renovation
Bidding
$190,000 CJ est. value
Grayslake, IL 60030

Last Updated 08/09/2022 03:58 AM
Project Title

Smart Overlay and ADA improvements

Physical Address View project details and contacts
City, State (County) Buffalo Grove, IL 60089   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,250,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

(3,294-Ft) Smart Overlay and ADA improvements located in Village of Buffalo Grove Region 1 District 1 Federal Project # N/A County(s) Lake Key Route(s) FAP 344 Marked Route(s) IL 83 Section(s) 2021-043-RS State Job #(s) C-91-139-21 PPS #(s) 1-80875-0000 VBP %: 0.00 Completion Date : 50 Working Days Questions not accepted as of July 26, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, July 15, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 011 - Smart Overlay and ADA improvements

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents