Similar Projects
Canterbury Furnaces
Alteration
Bidding
Salt Lake City, UT

DFCM Construction-Snow College Sevier Valley Center Chillers Replacement
Alteration
Bidding
$1,000,000 est. value
Richfield, UT 84701

Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

Canyonlands Field Airport Upgrade to Terminal Building Roof Top Units
Post-Bid
Moab, UT 84532

HEB Southeast Tower Fume Hood Upgrade
Results
$1,521,698 est. value
Salt Lake City, UT 84112

South Valley Services - HVAC Remodel/Construction
Results
West Jordan, UT 84088

DFCM Construction-Pre Qualified Mechanical-Udot Rampton MTF Building AHU and Unit Heaters
Alteration
Bidding
$771,000 est. value
West Valley City, UT 84119

Kanab Center Foundation Venting
Post-Bid
Kanab, UT 84741

HVAC Modifications
Results
Monticello, UT 84535

HVAC Generation 4/5 LG VRF System Service/Maintenance
Alteration
Bidding
Salt Lake City, UT

Fire Station Hot Water System Re-Pipe
Post-Bid
Riverton, UT 84065

Fashion Square Condenser Pump Replacement
Results
Less than $180,000 est. value
Murray, UT 84107

ATC Upgrades for Cedar Ridge, Deerfield, and Mount Mahogany Elementary Schools
Alteration
Bidding
Alpine, Cedar Hills, Pleasant Grove, UT 84062

Weatherization Assistance Program
Post-Bid
Orem, UT 84097

UNG North Salt Lake Armory RTU Units Replace
Results
Less than $280,000 est. value
Salt Lake City, UT 84129

Reported 12/10/2021 12:00 AM
Project Title

Information Technology Server Room A/C Replacement

Physical Address View project details and contacts
City, State (County) Ogden, UT 84401   (Weber County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace two data air units in the IT server room, and remove and replace two outdoor condensing units. Inclusions: 1. Perform coordination with facilities to isolate/bypass applicable system alarms to include fire/smoke alarm, security, etc. 2. Demo existing IT A/C units 3. Provide and install (2) Liebert CRV rack A/C units. 4. Provide and install (2) Liebert MC condensing units. 5. Replace piping and covers on outdoor units only 6. Provide crane lift of equipment 7. Provide and install (2) service disconnects on outdoor units 8. Adapt to existing wiring 9. Perform factory start up of equipment. Exclusion: 1. Existing HVAC systems demolition or modifications not listed in scope. 2. Furnish or install structural steel supports or framing for roof mounted equipment. 3. Service or repairs to existing HVAC equipment or systems not listed in scope. 4. Moving or relocation of owner furniture and items to allow for safe work access. 5. Concrete equipment pads. 6. Roof cutting or patching. 7. Wall cutting or patching. 8. Ceiling removal or installation. 9. Painting of installed equipment, piping or duct. 10. Premium time labor activity (evenings, weekends or holidays). 11. Survey, abatement, or disposal of hazardous materials. 12. Equipment or material expediting (additional charge if available)

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents