Project Title | B2759 Install Back-up Power Fuel Farm - Patuxent Naval Air Station |
Physical Address | View project details and contacts |
City, State (County) | Patuxent River, MD 20670 (Saint Marys County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Military Facility, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 [brand] Estimate |
Plans Available from | Plan Holders |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work Order 1689330 The general intent and purpose of this project is to install ten (10) commercially available backup power Diesel-fuel operated generators of various sizes, with their appropriate pedestals, concrete pads, overhead cover, and automatic transfer switches (ATS), to provide emergency power distribution for the base fuel farm equipment sites and facilities infrastructure for the following building structures: Fuel Tanks: B337, B1470, B1473, B1475, B2787, B2788 Administrative office buildings: B2622 and B 2623 VQ-4 Equipment pad and pantographs: B2234 Pier Motors and Pumps: B656 and B2860 GOV Service Station: B612 and B1058 PLC and Pumps controls: B2786 Hot pits: B1644 These building structures and facilities are powered by ten (10) different electrical utilities power inputs demarked by SMECO utilities meters. SMECO does not allow to connect more than one generator per meter. The requested backup power generators and their paired ATS systems will be directly connected to the base customer side of the of the electrical power distribution panel equipment to the SMECO meters following industrial standards, the National Electric Code, and UFCs and UFGS applicable codes and standards. The contractor will be required to provide confirmation for the feasibility of the preliminary project design provided, encompassing the size of the backup power generators and the location connection from the SMECO meters to the equipment, facilities, and infrastructure sites and buildings requested, taking into account factors for maximum protection, safety and durability. The project must be completed within 270-days of award, primary execution before 6/30/2023 and design acceptance by 12/31/202. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |