Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

Courthouse Gas Boiler Replacement
Alteration
Bidding
Central City, CO 80427

Chiller Services
Term Contract
Bidding
Thornton, CO

FCF Boiler Number 1 Equipment Bid Pack 1
Post-Bid
Less than $800,000 est. value
Canon City, CO

DWCF LU5 Steam Converter Replacement
Post-Bid
Less than $115,000 est. value
Denver, CO 80239

AFB 2141 CC 2018 Hail Damage Repairs
Results
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Mechanical, Electrical & Plumbing Construction Services
Results
Golden, CO 80401

Standing Order Contractor - Boiler Services
Alteration
Bidding
Bellvue, CO

Boiler Replacement for Mesa Elementary School
Post-Bid
Westminster, CO 80031

Replace Mechanical System and Upgrade Controls for Harmony Library LC
Results
Fort Collins, CO 80526

Cheltenham Mechanical and Electrical
Alteration
Bidding
Denver, CO 80204

Full-Service Mechanical Maintenance
Post-Bid
Denver, CO

Boilers 1, 3, 4, Terminal and Aob Pump Rooms Replacement
Results
Denver, CO 80249

Heating Boiler System at Building Ec-8 at Curecanti National Recreation Area
Alteration
Bidding
$100,000 est. value
Gunnison, CO 81230

Reported 04/20/2022 12:00 AM
Project Title

Renovate Sci Disco Backfill

Physical Address View project details and contacts
City, State (County) Boulder, CO 80301   (Boulder County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $650,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The NPL project will replace the existing building chiller and provide cooling via fan coil units to offices located on the north side of the building. We will also upgrade lighting to LED if we are able to accept the add alternate. 1. Base Bid: a. Extend chilled water distribution system. b. Provide 2-pipe cooling-only fan-coil units to serve the north perimeter offices and laboratories. c. Integrate new equipment into BAS. 2. Additive Alternate 1: a. Replace roof-mounted cooling tower. b. Replace condenser water pump serving the cooling tower. c. Integrate replacement cooling tower and pump into the BAS. 3. Additive Alternate 2: a. Replace lighting fixtures in the affected offices and labs with LED luminaires. b. Provide lighting control system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents