Similar Projects
SR 45 over Cold Run
Demolition, New Construction, Infrastructure
Conception
$1,155,000 CJ est. value
Millmont, PA 17845

SR 45 over Cold Run
Demolition, New Construction, Infrastructure
Conception
$1,155,000 CJ est. value
Millmont, PA 17845

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Paving - Moore Avenue
Results
Lewisburg, PA 17837

2021 Street Paving
Results
Lewisburg, PA

Country View Family Farms Feed Mill Facility
New Construction, Infrastructure
Pending Verification
$47,300,000 CJ est. value
New Columbia, PA 17856

Country View Family Farms Feed Mill Facility
New Construction, Infrastructure
Pending Verification
$47,300,000 CJ est. value
New Columbia, PA 17856

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Paving Contract
Infrastructure
Post-Bid
$245,000 est. value
PA

2021 Street Sealing
Results
Lewisburg, PA 17837

Newman Commons
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
East Buffalo Township, PA 17837

Last Updated 02/16/2023 12:09 AM
Project Title

SR 3014 over Turkey Run

Physical Address View project details and contacts
City, State (County) Limestone Township, PA 17844   (Union County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SR 3014 over Turkey Run, Limestone (Twp). Primary Improvement Type: Bridge Replacement As of February 16, 2023, the project is Future development stage. Anticipated letting date is September 01, 2024. PennDOT - SR 3014 over Turkey Run *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents