Similar Projects
Last Updated | 04/13/2023 03:32 PM |
Project Title | Hot Mix Asphalt Cold Milling and Resurfacing, Joint and Crack Repair and Pavement Markings on Napier Avenue |
Physical Address | View project details and contacts |
City, State (County) | Benton Harbor, MI 49022 (Berrien County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,042,677 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 0.80 mi of hot mix asphalt cold milling and resurfacing, joint and crack repair and pavement markings on Napier Avenue from Plaza Drive to Crystal Avenue, Berrien County. This is a Local Agency project. Net classification required for this project is Up to $1M Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N9-3G. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec STUL 11000 Job No 200086A Federal No 23A0309 MI DOT - 2304 014- Hot Mix Asphalt Cold Milling and Resurfacing, Joint and Crack Repair and Pavement Markings on Napier Avenue |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |