Similar Projects
Quiktrip #4209 At Lamar Landing
New Construction - 5,312 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Aurora, CO 80018

QuikTrip #4235 - Majestic Commerce Center
New Construction - 5,312 SF
Conception
Aurora, CO

Murphy Express #8994
New Construction - 2,800 SF
Design
Littleton, CO 80122

Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

Chambers Road Over Sand Creek Bridge Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Aurora, CO 80011

Chambers Road Over Sand Creek Bridge Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Aurora, CO 80011

Asphalt Repair FCI Englewood
Term Contract
Post-Bid
Littleton, CO

2021 Roadway Improvements Project
Infrastructure
Post-Bid
Bow Mar, CO

On-Site Improvements
Results
Greenwood Village, CO 80111

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Murphy Express #8973
New Construction - 2,800 SF
Construction
Aurora, CO 80016

Kum & Go Convenience Store and Fueling Station
New Construction - 5,620 SF
Construction
Aurora, CO 80016

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

Strickland Brothers 10 Minute Oil Change
New Construction - 1,455 SF
Pending Verification
Less than $500,000 CJ est. value
Aurora, CO 80011

Metro Center - Parcel A
New Construction
Design
Aurora, CO 80012

Last Updated 09/12/2022 04:09 PM
Project Title

Christian Brothers Automotive - Gartrell Road and East Aurora Parkway / Aurora

Physical Address View project details and contacts
City, State (County) Aurora, CO 80016   (Arapahoe County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction may begin spring 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

5,500 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents