Similar Projects
Cedar Falls Powerhouse - Valvehouse Rehabilitation - MC-CL-XC6324 - City of Seattle
Build-out, Renovation
Conception
$613,000 CJ est. value
North Bend, WA 98045

35th Avenue Southwest Paving - MC-TR-C099 - City of Seattle
Infrastructure
Conception
$35,000,000 CJ est. value
Seattle, WA 98126

New Transition Services Educational Facility
New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Bellevue, WA 98004

Eastrail Trail Connection at Spring Boulevard - City of Bellevue
Infrastructure
Design
$7,500,000 CJ est. value
Bellevue, WA 98005

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$130,000,000 CJ est. value
Issaquah, WA 98029

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

Heavy Civil General Contractor/Construction Manager Services for Atlantic Base Yard Refurbishment Project
Infrastructure
Post-Bid
$22,000,000 est. value
Seattle, WA 98134

Thomas Jefferson High School Field Package
Infrastructure, Alteration
Post-Bid
Auburn, WA 98001

Rt 44 Transit Plus Multimodal Corridor
Alteration
Results
Seattle, WA

Tennis Court and Site Improvements at Ingraham High School
Renovation, Infrastructure
Results
Seattle, WA 98133

Gridline Apartments
New Construction, Infrastructure
Construction
$66,400,000 CJ est. value
Seattle, WA 98122

Yesler Block 8
New Construction, Infrastructure
Construction
$84,000,000 CJ est. value
Seattle, WA 98102

RFQ Engineering - Fort Dent Repairs Project
Infrastructure
Pending Verification
$692,119 CJ est. value
Issaquah, WA 98029

Sand Point Way NE Mixed Use Building
New Construction, Infrastructure
Pending Verification
$22,600,000 CJ est. value
Seattle, WA 98105

Soundview Athletic Field Conversion - MC-PR-41074 - City of Seattle
Infrastructure
Conception
$6,500,000 CJ est. value
Seattle, WA 98117

Last Updated 08/19/2022 09:07 AM
Project Title

Diablo - Replace Bank Transformers - MC-CL-XS6589 - City of Seattle

Physical Address View project details and contacts
City, State (County) Seattle, WA 98164   (King County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2026
Bids Due View project details and contacts
Estimated Value $4,115,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project replaces the two Diablo generator step up transformer banks as they reach the end of their useful life. As of August 19, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2026. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents