Similar Projects
Ruins Road Repair
Infrastructure
Bidding
Aztec, NM 87410

Construction of Warm Springs Blvd. Map Project Phase 1
Infrastructure
Bidding
Elephant Butte, NM 87935

Altura Avenue Phase III Infrastructure Improvements Project
Post-Bid
Columbus, NM 88029

Restore Some Retention Dams and Erosion Control Structures
Post-Bid
Cuba, NM 87013

Wide Flood Control Rehabilitation IX
Results
$1,600,000 est. value
Albuquerque, NM

Weimer Road Drainage and Road Improvements
Results
Taos, NM 87571

2021 Eledge Ditch Job
Infrastructure
Bidding
Flora Vista, NM

Non-Point Source Pollution Prevention Project for the Santa Clara Creek Watershed - 2020
Post-Bid
Espanola, NM 87532

Aveh Poe Drainage Crossing and Nambe Plaza Drainage
Results
Pueblo of Acoma, NM 87506

Washington / De Soto Drainage Improvements
Infrastructure
Bidding
Belen, NM

Drainage Crossing Improvements
Post-Bid
Cimarron, NM 87714

Fifth Street, Baca Street, and Pine Street Improvements
Results
Mosquero, NM 87733

Drainage Structures, Roadway Reconstruction
Infrastructure
Bidding

Concrete Check and Turnout Structures
Post-Bid
Mora, NM 87732

Construction of the La Mesilla Community Ditch Association Acequia Improvements
Results
Santa Cruz, NM 87567

Last Updated 09/30/2021 08:24 AM
Project Title

La Cueva Ditch Association - Headworks Improvements Project

Physical Address View project details and contacts
City, State (County) La Madera, NM   (Rio Arriba County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method General Contractor to Subcontract.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the construction of a new gabion weir structure at the headworks of the La Cueva Ditch in La Madera, NM including river diversion and restoration work, installation of structural steel works, gabions, concrete, backfill, compaction, and miscellaneous construction.

Details

Division 03 - Concrete, Concrete Accessories, Reinforcement Bars, Stainless Steel Reinforcement Bars.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Gabions.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents