Similar Projects
AIP Wells Parking Apron Maintenance
Results
$342,500 est. value
Hutchinson, KS

Colonel James Jabara Airfield Pavement Rehabilitation
Infrastructure
Post-Bid
Wichita, KS 67226

Airfield Paint & Rubber Removal Maintenance - Mcconnell AFB Fy21
Term Contract
Post-Bid
$100,000 to $250,000 est. value
McConnell AFB, KS

Forbes Aircraft Ramp Repair, Topeka Kansas
Infrastructure
Post-Bid
$10,000,000 to $25,000,000 est. value
Topeka, KS 66619

Repair Runway
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
KS

WLD T-Hangar and Taxilane Construction
New Construction, Infrastructure
Results
$1,000,000 est. value
Winfield, KS 67156

Airport General Aviation Apron Reconstruction Phase 1
Infrastructure
Results
Wichita, KS 67209

Jabara Airfield Pavement Rehabilitation and Wind Cone Replacement
Infrastructure
Post-Bid
Wichita, KS 67226

Liberal Mid-America Regional Airport - Apron Rehabilitation
Infrastructure
Post-Bid
Liberal, KS 67901

Rehabilitate Aircraft Parking Apron and Taxiways -Herington Regional Airport (HRU)
Infrastructure
Results
Herington, KS 67449

Smith Center Municipal Airport
Infrastructure
Results
Smith Center, KS

Rehabilitate Airport Runway and Taxiway
Infrastructure
Results
Fort Scott, KS 66701

Atkinson Airport, Apron Reconstruction and Expansion
Infrastructure
Post-Bid
Pittsburg, KS 66762

Reconstruct T-Hangar Taxilanes
Infrastructure
Bidding
$800,000 to $1,000,000 est. value
Burlington, KS 66839

Last Updated 04/22/2022 09:03 AM
Project Title

CBK Replace PAPIs and Install REILs

Physical Address View project details and contacts
City, State (County) Colby, KS   (Thomas County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of replacing existing PAPIs with new 4-box PAPI systems and installing REILs on Runway 17-35.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents