Similar Projects
Safe and Secure Storage
New Construction - 110,000 SF
Design
$10,000,000 CJ est. value
Coral Springs, FL 33065

Storage King USA
New Construction - 110,583 SF
Design
$7,000,000 est. value
Hollywood, FL 33020

FPL Gulfstream Fleet Garage and Storage Warehouse
New Construction - 15,600 SF
Bidding by Invitation
$3,312,888 est. value
Davie, FL 33024

Self Storage Facility
New Construction - 103,275 SF
Sub-Bidding
$10,000,000 CJ est. value
Coral Springs, FL 33071

Margate Self Storage
New Construction - 133,872 SF
Post-Bid
$8,352,943 est. value
Margate, FL 33063

Cubesmart and Retail
New Construction, Build-Out - 115,859 SF
Post-Bid
$7,414,425 est. value
Pompano Beach, FL 33060

Utilities Storage Building at Prospect Wellfield
Results
Less than $100,000 est. value
Fort Lauderdale, FL

Fleet Repair and Maintenance Facility
New Construction
Results
Oakland Park, FL

Stor-All Self Storage
New Construction - 1,913,144 SF
Construction
$10,334,956 est. value
Deerfield Beach, FL 33442

Old Dominion Freight Line Inc
Addition - 2,329 SF
Construction
$583,482 est. value
Pompano Beach, FL 33069

Safe & Secure Self Storage
New Construction - 220,100 SF
Design
$10,000,000 CJ est. value
Oakland Park, FL 33311

Public Storage
New Construction, Demolition - 95,178 SF
Post-Bid
$5,802,599 est. value
Pompano Beach, FL 33060

Emergency Distribution Center Buildout
Results
Less than $900,000 est. value
Fort Lauderdale, FL

Burlington Self Storage
New Construction - 97,040 SF
Construction
$4,400,000 est. value
Fort Lauderdale, FL 33300

Bel Lago Self Storage
New Construction - 89,966 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Coconut Creek, FL 33073

Last Updated 05/24/2019 09:05 AM
Project Title

Re-Cladding of the Grounds Maintenance Building

Physical Address View project details and contacts
City, State (County) Pembroke Pines, FL 33025   (Broward County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Re-Cladding of the Grounds Maintenance Building in order to improve the structural and exterior conditions of the building which have been deteriorated by normal wear and tear. A. Demolition Work: 1. Contractor to remove all existing metal trim, roof panels and wall panels. 2. Any purlins and struts that require replacing due to corrosion shall be removed and disposed of. 3. Remove secondary framing from existing overhead door opening for installation of (1) new overhead door at this opening. 4. Contractor shall be responsible to remove all debris from the site daily. 5. Do not allow materials and debris generated daily to be dispose of in an illegal manner. 6. Demolish as required to accomplish work. All required demolition shall be included in the base bid package submitted by the contractor. B. New Work: 1. Contractor shall sandblast, prepare and paint the building structure prior to re-cladding the building, per the attached Sherwin Williams specs. 2. Install new purlins, struts in place of the corroded ones as per engineered drawings provided by the contractor. 3. Install new wall and roof panels along with all trim, attachments and accessories. 4. Roof panels shall be standing seam, factory painted white in color. 5. Wall panels shall be factory painted, color TBD. 6. All exterior wall bases shall have new rubberized base closures 7. All exterior doors to be painted, color TBD. 8. Building roof shall be insulated with spray foam insulation. 9. Steel shall be 24 gauge Galvalume steel sheeting. 10. Install (1) new garage roll-up door per the applicable code requirements. 11. Contractor shall re-install all plumbing, light fixtures, cameras and any other existing services on the building, being affected by the re-cladding. 12. Install new aluminum gutters and downspouts. 13. Contractor is responsible for acquiring all applicable permits and call in all necessary inspections.
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents