Project Title | Re-Cladding of the Grounds Maintenance Building |
Physical Address | View project details and contacts |
City, State (County) | Pembroke Pines, FL 33025 (Broward County) |
Category(s) | Commercial |
Sub-Category(s) | Warehouse/Storage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Re-Cladding of the Grounds Maintenance Building in order to improve the structural and exterior conditions of the building which have been deteriorated by normal wear and tear. A. Demolition Work: 1. Contractor to remove all existing metal trim, roof panels and wall panels. 2. Any purlins and struts that require replacing due to corrosion shall be removed and disposed of. 3. Remove secondary framing from existing overhead door opening for installation of (1) new overhead door at this opening. 4. Contractor shall be responsible to remove all debris from the site daily. 5. Do not allow materials and debris generated daily to be dispose of in an illegal manner. 6. Demolish as required to accomplish work. All required demolition shall be included in the base bid package submitted by the contractor. B. New Work: 1. Contractor shall sandblast, prepare and paint the building structure prior to re-cladding the building, per the attached Sherwin Williams specs. 2. Install new purlins, struts in place of the corroded ones as per engineered drawings provided by the contractor. 3. Install new wall and roof panels along with all trim, attachments and accessories. 4. Roof panels shall be standing seam, factory painted white in color. 5. Wall panels shall be factory painted, color TBD. 6. All exterior wall bases shall have new rubberized base closures 7. All exterior doors to be painted, color TBD. 8. Building roof shall be insulated with spray foam insulation. 9. Steel shall be 24 gauge Galvalume steel sheeting. 10. Install (1) new garage roll-up door per the applicable code requirements. 11. Contractor shall re-install all plumbing, light fixtures, cameras and any other existing services on the building, being affected by the re-cladding. 12. Install new aluminum gutters and downspouts. 13. Contractor is responsible for acquiring all applicable permits and call in all necessary inspections. | ||||||||||||||||||
Details |
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |