Similar Projects
Enola Road Pavement Preservation
Infrastructure
Conception
$6,565,748 CJ est. value
Carlisle, PA 17015

Enola Road over Bloser Creek
Demolition, New Construction, Infrastructure
Conception
$550,000 CJ est. value
Carlisle, PA 17015

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

RFP Engineering - Doublin Gap Motocross Access Drive Site Design Plan
Infrastructure
Bidding
$150,000 CJ est. value
Shippensburg, PA 17257

Hammond Road
Infrastructure
Bidding
$600,000 CJ est. value
South Newton Township, PA 17257

RFQ Contractor - AHEC Track Lighting Install
Infrastructure
Post-Bid
$200,000 CJ est. value
Carlisle Brks, PA 17013

Veterans Recognition Park Development
Infrastructure
Post-Bid
$25,000 CJ est. value
Enola, PA 17025

2022 New Cumberland Borough Street Improvement Project
Infrastructure
Results
$298,450 CJ est. value
New Cumberland, PA 17070

Bridge Repairs
Infrastructure
Results
$2,497,000 CJ est. value
Carlisle, PA 17015

Riverton Woods / Lemoyne Borough
New Construction, Infrastructure
Construction
$11,000,000 CJ est. value
Lemoyne, PA 17043

The Goddard School / Enola
New Construction, Infrastructure
Construction
$3,000,000 CJ est. value
Enola, PA 17025

Smith Farm Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$60,000,000 CJ est. value
Carlisle Brks, PA 17013

Hempt Farms Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Mechanicsburg, PA 17050

HBG Pike SB over Bypass
Infrastructure, Renovation
Conception
$1,350,000 CJ est. value
Carlisle, PA 17015

Last Updated 04/11/2023 09:06 AM
Project Title

Childrens Lake - Dam Rehabilitation and Improvement - Phase 1

Physical Address View project details and contacts
City, State (County) Boiling Springs, PA 17007   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated Range: .1 General - $2,000,000 - $3,000,000 Liquidated Damages = (.1) $750.00 Per Day. There is no Bid Guaranty required for this Project. SDB = 10% VBE = 3% The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. Duration: 280 Calendar Days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents