Similar Projects
On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

18” Well Transmission Pipeline Project - Materials Supply
Post-Bid
Hurricane, UT 84737

Construction of the 2019 Fire Flow Projects
Results
UT

18K: Printers Row Waterline Replacement
Results
West Valley City, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Spanish Fork Ne Irrigation Pipeline
Results
Spanish Fork, UT

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

2019 Public Works Project
Results
Hyrum, UT 84319

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

2020 Water Line Projects - 100 E, 200 E, and 300 E
Post-Bid
Midway, UT 84049

500 South Surplus Siphon Vault Replacement
Results
Less than $244,438 est. value
Salt Lake City, UT 84104

Construction of 625 West Waterline Replacement
Post-Bid
Bountiful, UT 84010

Scenic Drive Upper Conduit Slipline Project
Results
Less than $695,500 est. value
Salt Lake City, UT 84104

2020 Geneva Park Parking Lot Project
Post-Bid
$375,000 to $445,000 est. value
Orem, UT 84057

Last Updated 02/01/2021 10:45 AM
Project Title

Milford City Water Improvement Project

Physical Address View project details and contacts
City, State (County) State-Wide: UT
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing: A new 600,000 gallon concrete storage tank at the site of the City's existing tank; modifications and repairs to the existing concrete tank; a new booster pump station and equipment replacing an existing booster pump station; distribution improvements consisting of approximately 900 feet of 8" pipeline, 600 feet of 10" pipeline, 12,200 feet of 12" pipeline, 2,200 feet of 16" pipeline, valve replacements; a new concrete well building; installation of well equipment and controls for a new well at the new well building site; a system wide SCADA system; 3 standby generator systems; modifications to an existing well (equipment and controls); and a new radio read meter system including system software and reading equipment, approximately 700 new radio-read meters, new meter setters.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents