Similar Projects
2021 Preventive and Critical Lining
Bidding
$3,600,000 to $4,000,000 est. value
Denver, CO 80202

North Public Road Sanitary Sewer Main Extension
Post-Bid
Lafayette, CO 80026

Sand Traps - On-Call Single Trade Services
Post-Bid
Denver, CO 80202

35th Street and Lincoln Park Sanitary Improvements
Results
Less than $2,015,784 est. value
Denver, CO 80202

2019 Sanitary Sewer Improvements
Results
Less than $1,000,000 est. value
Lakewood, CO 80228

Candelas Community Commercial Parcels, Candelas Medical Phase 2 Utilities Project
Post-Bid
Arvada, CO

Ridge Gate Happy Canyon Trunk Sanitary Sewer
Results
Lone Tree, CO

Quarterly Grease Trap Pumping
Post-Bid
Florence, CO 81226

23 Road Sewer Trunk Line Extension Project
Results
Less than $500,000 est. value
Grand Junction, CO

2019 Manhole Rehabilitation
Post-Bid
Sterling, CO 80751

Miller Sanitary and Reuse Pipelines
Results
Less than $1,427,052 est. value
Lafayette, CO

Installation of The A-12 to A-12A-2 Sanitary Sewer Replacement
Post-Bid
Aspen, CO 81611

Leon Sreet Sanitary Sewer Project
Results
$30,000 est. value
Delta, CO

2020 Sewer Trenchless Point Repairs
Post-Bid
Salida, CO 81201

2020 SACWSD Wastewater System Rehabilitation
Results
Commerce City, CO 80022

Last Updated 05/29/2020 11:25 PM
Project Title

2020 Sanitary Sewer Replacement Project

Physical Address View project details and contacts
City, State (County) Littleton, CO 80120   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will involve replacement and spot repairs of sanitary sewer pipe in various locations within Littleton, Colorado. The project includes eight (8) separate locations of work; consisting of 258 linear feet of 8” PVC pipe, 50 linear feet of 6” PVC pipe, 10 linear feet of 15-inch PVC, 348 linear feet of pipe bursting 15” to 18” HDPE, surface restoration, verifying active service taps, and the reconnection of 4 existing service taps. Work is located in both streets and vegetated areas. Resident notification and property access determination is required. Bypass pumping and/or flow control and post televising (CCTV) will also be required. Traffic control is required for work within streets.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents