Similar Projects
E Line Expo Park/Vermont/USC Station Improvements - Los Angeles County Metropolitan Transportation Authority (LA Metro)
New Construction, Infrastructure
Conception
$999,000,000 CJ est. value
Los Angeles, CA 90012

Waterline Improvement - Pearson Drive/Foothill Drive - City of Brentwood
Infrastructure
Conception
Brentwood, CA 94513

40th Street Bridge Railing Painting, Lumec Light Pole Painting, Marina Lighting Replacement Project
Infrastructure
Design
$3,697,792 CJ est. value
Emeryville, CA 94608

Bellagio Car Wash
New Construction, Infrastructure - 7,141 SF
Design
$2,000,000 CJ est. value
Lawndale, CA 90260

RFQ Construction Manager - Construction Management Services for Terminal Roadway Improvements Project at Long Beach Airport
Infrastructure
Bidding
$10,600,000 CJ est. value
Long Beach, CA 90808

Miscellaneous Water Main Replacements
Infrastructure
Bidding
$3,000,000 CJ est. value
Torrance, CA 90503

691 Water Valve Maintenance & Repair
Term Contract
Post-Bid
Los Angeles, CA

Danville Sewer Renovations, Phase 4
Infrastructure
Post-Bid
$4,100,000 CJ est. value
Danville, CA 94526

WRCRWA Anaerobic Digester #3
Infrastructure
Results
$4,800,000 est. value
Corona, CA 92880

Annual Slurry Seal at Various Locations FY 21-22
Infrastructure
Results
$514,961 CJ est. value
Orange, CA 92866

Coachella Research Park #2 Phase 1
New Construction, Infrastructure - 833,829 SF
Construction
$90,000,000 CJ est. value
Coachella, CA 92236

Sunset Boulevard Apartment Complex
Demolition, New Construction, Infrastructure - 20,000 SF
Pending Verification
$26,400,000 CJ est. value
Los Angeles, CA 90026

Alpha Beta and Uptown North Sites Redevelopment
New Construction, Infrastructure - 5,000 SF
Pending Verification
$200,000,000 CJ est. value
Whittier, CA 90601

New Water Wells No. 27 and No. 28 - 18665 - City of Downey
Infrastructure
Conception
$8,000,000 CJ est. value
Downey, CA 90241

Reconstruct Drainage
Infrastructure
Design
$4,770,000 CJ est. value
Willits, CA 95490

Last Updated 10/18/2022 01:03 AM
Project Title

Weed Elementary School Construction of 1 Kitchen /Cafeteria Building Increment 1 Underground Utilities

Physical Address View project details and contacts
City, State (County) Weed, CA 96094   (Siskiyou County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Weed Elementary School, Construction of 1 - Kitchen/Cafeteria Building (Increment 1) Bid Package WES2022.1.33.1 Utilities: Sanitary Sewer and Stormwater The District and CRM Group shall not be held responsible for contractors receiving bid documents from any other entity, plan/bid exchange, or posting. All formal Bid Documents should be requested from CRM Group directly. Failure to contact CRM Group for comprehensive bid documents as CRM posts, shall not constitute grounds for a bid protest. The successful bidder shall commence work within 5 days from Notice to Proceed. All work shall be completed within 25 working days and not later than 25 working days from Notice to Proceed. 2. In contracts involving expenditures in excess of $25,000.00, the successful bidder shall file a payment and performance bond issued by an admitted Surety authorized to conduct business in California, in the form set forth in the Contract Documents. A payment bond may be required for contracts involving smaller expenditures at the option of the District. All forms must be completed, signed, and returned with the bid. The contract award will be based on the lowest responsive and responsible bidder. The lowest bid shall be the lowest total of the bid prices on the base contract. Minority, women, and disabled veteran contractors are encouraged to submit bids. The contract is for a public work. Contractor and any subcontractor shall pay all workers on the project at least the general prevailing rate of per diem wages as determined by the Director of the Department of Industrial Relations ( DIR ) pursuant to Labour Code section 1770 et seq. Prevailing wage rates are available from the District or online at No contractor or subcontractor may be listed on a bid proposal or awarded a contract for public work unless currently registered with the DIR pursuant to Labour Code section 1725.5. This project is subject to compliance monitoring and enforcement by the DIR. All contractors will be required to pass Department of Justice and FBI fingerprinting clearance prior to beginning any work on-site. Each bidder shall be a licensed contractor at the time of bid pursuant to the Business and Professions Code and such license(s) shall remain in active and good standing for the duration of the contract. The bidder shall be licensed for all work and individual disciplines within the entire scope of work, and, at minimum, in one or more .

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents