Similar Projects
Country Club Expansion
Renovation
Conception
Glenview, IL 60025

Maine South HS Synthetic Turf Replacement
Post-Bid
Park Ridge, IL 60068

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

Grant Park Splash Pad
Results
Less than $257,600 est. value
Northlake, IL 60164

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 31,184 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 31,184 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Site Paving
Post-Bid
Elgin, IL 60120

Maple Park
Results
Palatine, IL

Tuley Fieldhouse Roof, Foundation & Drainage
Renovation
Post-Bid
Chicago, IL 60619

Sidewalk, Curb
Results
Hanover Park, IL

Removal and Replacement Existing Damage Sidewalk, Curb and Gutter
Post-Bid
Bartlett, IL

2021 Crack Routing and Sealing
Results
Hanover Park, IL

East Eighth Street Reconstruction
Post-Bid
Hinsdale, IL

Last Updated 08/15/2022 04:01 PM
Project Title

Flowers Park Court Renovation

Physical Address View project details and contacts
City, State (County) Lincolnwood, IL 60712   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Project Delayed, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 15, 2022, this project is in the final planning phase. A firm timeline for a rebid and start of construction start date has not been determined. *The closed solicitation has been included below for reference: For Flowers Park Court Renovation Work generally includes asphalt paving, tennis court renovation, basketball court renovation, and site furniture. Specifications require the submittal of a 10% Bid Surety with the proposal. In addition, the successful contractor(s) must be able to provide a satisfactory Performance Bond, Labor and Material Payment Bond, and required proof of insurance following the award of a contract. All contracts for work herein are subject to all Village rules and regulations, and providing for the payment of Cook County's prevailing wage rate to all workers involved in these projects. All bids will remain firm for 60 days after the bid opening. The Village of Lincolnwood reserves the right to reject any or all bids, to waive informalities on a bid, and to accept the lowest responsible bid that serves the best interests of the Village. *This project is on hold due to the public health crisis. A new timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents