Similar Projects
Shared-Use Paths, and Sidewalks
Infrastructure
Conception
Moline, IL

Relief Wells at Wood River Levee District - USACE St. Louis
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Wood River, IL 62095

441 Main Street
Infrastructure
Bidding
Cary, IL

Inspection, Preventative Maintenance, Repair, Replacement of VFD Pumps
Term Contract, Infrastructure
Bidding
Chicago, IL

Submersible Explosion Proof Pumps
Post-Bid
Wheaton, IL 60187

Lot Repairs at Champaign Sign Shop
Post-Bid
Champaign, IL 61820

Calumet Park SD 132 - Sidewalk Improvements
Results
Calumet Park, IL 60827

ADA Improvement Project Located along Various State Routes Located in the Villages of Homer Glen, Lemont and Orland Park
Results
Homer Glen, Lemont, Orland Park, IL 60439

(3.007 Mile) Design Overlay and Ada Ramp Improvements
Infrastructure
Bidding
Burnham, Calumet City, IL

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Construction of Sidewalks and ADA Ramps at Various Locations in Pekin
Results
IL

County Line Road: I-294 Ramp to North Avenue
Post-Bid
IL

ADA Improvement
Results
Blue Island, Country Club Hills, Oak Forest, IL 60478

Well 6 Repairs
Post-Bid
Antioch, IL

Construction of a Shared-Use Path Adjacent to Avenue of the Cities, from Hospital Road to Greenview Memorial Gardens in the City of Silvs
Results
IL

Reported 12/22/2021 04:38 PM
Project Title

Wyckles East Lagoon Decant Structure Upgrades

Physical Address View project details and contacts
City, State (County) Decatur, IL 62522   (Macon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Pumps and Wells, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $167,450
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvements generally consist of demolition and removal of portions of a concrete wet well and appurtenances therein. Reconstruction of the dewatering control structure and cleaning and installing flow control devices inside the lagoon decant wet well are required. Station modifications include addition of concrete corbels to support cantilevered concrete walkway. Location of work - 1147 S Wyckles Rd, Decatur, IL 62522

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents