Similar Projects
Abernathy Fish Technology Center(FTC) Rehabilitation Intake Structure
Renovation
Bidding
$5,000,000 CJ est. value
Longview, WA 98632

Farmland Conservation, Phase II
Infrastructure
Bidding
$640,000 CJ est. value
Everett, WA 98201

Facilities Asbestos Abatement Project
Term Contract, Infrastructure
Sub-Bidding
$60,000 CJ est. value
Arlington, WA 98223

Property Abatement, Demolition, Decommissioning, Asbestos Abatement, and Related Civil Construction
Term Contract, Demolition, Infrastructure
Sub-Bidding
$350,000 CJ est. value
Tacoma, WA 98405

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

2442 WLSP Sinkhole Lake Restoration
Infrastructure
Results
$276,650 est. value
Bellevue, WA 98008

Lechtenberg Farm Asbestos Abatement
Alteration
Results
$91,300 to $100,900 est. value
Vancouver, WA 98660

Acceptance of Non Hazardous Fill (Pool Bid)
Alteration
Post-Bid
WA

Terminal 1 Red Lion Hotel Demolition
Infrastructure, Alteration
Results
$1,606,000 to $1,775,000 est. value
Vancouver, WA 98660

Pierce County - Property Abatement, Demolition, Decommissioning, Asbestos Abatement, and Related Civil Construction
Alteration
Post-Bid
$350,000 est. value
WA

Weatherization - Stick Built 8539
Alteration
Results
Less than $50,000 est. value
Puyallup, WA

City Hall and Police Department Abatement
Alteration
Post-Bid
Prosser, WA

Weatherization - Sw Mobile Home 8541
Alteration
Results
Less than $50,000 est. value
Puyallup, WA

General and Emergency Abatement Work
Alteration
Post-Bid
Pasco, WA

Last Updated 09/06/2022 09:36 AM
Project Title

Improvement of the Sunset Highway Bridge No. 0514

Physical Address View project details and contacts
City, State (County) Spokane, WA 99224   (Spokane County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $346,654 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bid date has been changed from 7/6/22 to 7/13/2022 improvement of the Sunset Highway Bridge No. 0514 located in Section 20 & 29, Township 25 N, Range 40 E.W.M., by the removal of the existing bridge and restoration of the creek banks on N. Fork Deep Creek. Included are bridge removal, Creek diversion, streambed gravel, silt fence, erosions control blanket, permanent signing, temporary traffic control, concrete barrier and other work all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. The following is applicable to Federal-aid projects. The County of Spokane, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252,42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. BID DEPOSIT REQUIRED. No bid may be considered for public work unless it is accompanied by a bid deposit in the form of a surety bond, postal money order, case, cashier""'s check or certified check in an amount equal to five percent (5%) of the amount of the bid proposed. If the bidder to whom the contract is awarded fails to enter into the contract and furnish the contractor""'s bond as required within ten delays after notice of the award, exclusive of the day of notice, the amount of the bid deposit shall be forfeited to the County and the contract awarded to the next lowest and best bidder. If the bid deposit is"cash and is in the form of a postal money order, cashier"s check or certified check the checks are to be made payable to the Spokane County Treasurer. Cash bid deposits are to accompanied by a completed Bid Deposit Form (see Appendix). Cash bid deposits of all unsuccessful bidders shall be returned after the contract is awarded and the required contractors bond and proof of insurance given by the successful bidder is accepted by the Board of County Commissioners. If the bid deposit is in the form of a surety bond it must be of a corporate surety licensed to do business in the State of Washington accompanied by a completed Bid Deposit Surety Bond Form (see Appendix). WARNING: If the bidder is to submit a bid deposit in the form of a Surety Bond, the County strongly recommends the use of the County Bid Deposit Surety Form contained in the appendix. Recent analysis has revealed that as many as 30% of the bid surety bonds submitted on public works projects are potentially fatally flawed as the contain qualifications to the 5% forfeiture penalty mandated by RCW 36.32.250. If the County Bid Deposit Surety Bond Form is not used, the bidder is warned to take special care in assuring that the language contained in the form used does not materially alter, qualify or conflict with the terms and conditions set forth in the County Bid Deposit Surety Bond Form, Bid Deposit Surety Form and RCW 36.32.250. Any such material alteration, qualification or conflict shall make the bid non-responsive and shall cause the bid to be rejected by the County. Digital files are available to bidders at no cost. Printed documents are available at bidder expense. The successful bidder will be required to file a performance bond in the full amount of the contract price which bond shall be furnished by a Surety Company acceptable to the Board of County Commissioners. The Board of County Commissioners reserves the right to reject any or all bids or any part of a single bid and to waive all informalities in the bidding

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents