Similar Projects
HVAC Services
Term Contract
Post-Bid
$16,900 est. value
Bethlehem, PA 18018

HVAC and Mechanical Products
Term Contract
Post-Bid

Addition and Alterations to Municipal Complex, Contract No. 4 - HVAC Construction Contract
Results
Less than $1,260,000 est. value
Allentown, PA 18104

Replace Data Center HVAC System at Lehigh County Government Center
Results
Allentown, PA 18101

Air Filters
Results
Allentown, PA 18103

Lehigh County Jail Add Air Conditioning to Pod 4A
Results
Allentown, PA 18102

Whitehall Township Municipal Improvements - HVAC Construction
Results
Less than $1,462,693 est. value
Whitehall, PA

Split System Chiller and Pump Replacements at the Eyer Middle School
Results
Macungie, PA 18062

Chiller Corrosion Protection Project
Results
Allentown, PA

Replace Furnaces at 117 Apartments at Lynfield
Results
Less than $175,000 est. value
Bethlehem, PA 18017

HVAC Replacement
Results
Allentown, PA 18102

Replace HVAC Equipment - Phase 2
Results
Fountain Hill, PA 18015

Parkland Bus Storage Building - HVAC Construction
Results
$61,000 est. value
Orefield, PA 18069

Cooling Tower Fan Blade Replacement Project
Results
Allentown, PA 18101

HVAC Equipment Maintenance
Results
Allentown, PA 18104

Last Updated 02/18/2020 09:48 AM
Project Title

Whitehall Football Stadium Improvements - HVAC Construction

Physical Address View project details and contacts
City, State (County) Whitehall, PA 18052   (Lehigh County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of alterations and improvements to the Whitehall High School Football Stadium located on Zephyr Boulevard in Whitehall, Lehigh County, Pennsylvania. Heating, Ventilating and Air Conditioning Construction Contract: The Work includes, but is not limited to, the following: a. Selective demolition of existing HVAC Systems. b. Rooftop air handling units. Roof curbs for this equipment are to be furnished by the HVAC Contractor and installed by General Contractor. All required supplemental steel for this equipment to be provided by the HVAC contractor. c. Terminal HVAC equipment including radiation and unit heaters. d. Exhaust fans, and associated ductwork, and roof curbs. Roof curbs for this equipment are to be furnished by the HVAC Contractor and installed by General Contractor. All required supplemental steel for this equipment to be provided by the HVAC contractor. e. Installation of ductwork and duct accessories for air systems including all grilles, registers and diffusers. f. Installation of thermal and acoustical insulation for ductwork, and associated equipment. g. Automatic temperature control systems. h. HVAC system Testing, Adjusting and Balancing will be performed by the Owner.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents