Similar Projects
Bridge over Norfolk Southern
New Construction, Infrastructure
Conception
$5,013,000 CJ est. value
Hammond, IN 46324

Bridge over Norfolk Southern
New Construction, Infrastructure
Conception
$5,013,000 CJ est. value
Hammond, IN 46324

Tailor Row
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Hammond, IN 46320

Bid Package #3 - Additions and Renovations to Bibich Elementary - Mechanical/Electrical Package
Addition, Demolition, Renovation, Infrastructure
Design
$3,238,550 CJ est. value
Dyer, IN 46311

Intersection Improvement With Added Turn Lanes
Infrastructure
Post-Bid
$3,454,791 CJ est. value
Gary, IN 46403

Intersection Improvement With Added Turn Lanes
Infrastructure
Post-Bid
$3,454,791 CJ est. value
Gary, IN 46403

Exchange Avenue Reconstruction
Infrastructure
Results
East Chicago, IN 46312

Little Calumet River Trail Pedestrian Bridge
New Construction, Infrastructure
Results
Hammond, IN

New Administration Center, Alternative Education and Resource Center and Related Work
New Construction, Infrastructure
Construction
$19,869,043 CJ est. value
Crown Point, IN 46307

2022 CCMG Street Improvement Project
Infrastructure
Construction
$1,533,684 CJ est. value
Highland, IN 46322

St. John Commons
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Dyer, IN 46311

Subdivision - Goodwill Store
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Crown Point, IN 46307

RFP - Stormwater Improvement Project on Us 20
Infrastructure
Design
$200,000 CJ est. value
Gary, IN 46402

Contract 1 - 2022 Water Main Replacement Projects
Infrastructure
Post-Bid
$1,955,755 CJ est. value
Saint John, IN 46373

Concrete Pavement Restoration, Bridge Deck Overlay - I 65
New Construction, Infrastructure
Results
$25,594,300 est. value
La Porte, IN

Last Updated 01/08/2024 12:02 AM
Project Title

Bridge Replacement - US 30

Physical Address View project details and contacts
City, State (County) Merrillville, IN 46410   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,256,844 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Control No. 1703004 Federal/State No. 1703004 Completion Date : September 20, 2024 Bridge Replacement 030-45-10357 Composite Steel Beam Lake County - on Us 30 Over Dyer Ditch, 1.10 Miles West of Us 41 (Rp 001+0063) Contractors desiring to submit electronic bids via Electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Electronic bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT - Call 431 - Bridge Replacement - US 30 Set Aside(s) MBE (21%), WBE (7%), DBE (6%)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents