Similar Projects
Sewer Cleaning and Mapping
Post-Bid
Jekyll Island, GA

As-Needed Emergency Water And Sewer Repairs
Post-Bid
Cumming, GA

Disaster Recovery and Sewage Cleaning Services
Term Contract
Results
GA

Prosperity Drive Water and Sewer Improvements
Results
Garden City, GA 31418

Septic System
Post-Bid
Morven, GA 31638

Splost North Mainland Phase III Force Main Improvement
Results
Less than $2,800,000 est. value
Brunswick, GA 31520

Tunnel Hill Sewer Expansion Project
Post-Bid
Dalton, GA

LL Creek Sewer Relocation
Results
Waycross, GA 31501

Construction of the English and Simpson Ranges Water and Sewer Supply
Post-Bid
Columbus, GA

Omnitrax Utility Extension
Results
Less than $589,472 est. value
Rincon, GA 31326

Annual On-Call Water and Sewer Emergency Repair
Term Contract
Post-Bid
Stockbridge, GA

Utility Extension Ribin Builders
Results
Less than $400,000 est. value
Lyons, GA

Annual Contract for CCTV Inspections
Post-Bid
Morrow, GA

Grease Trap Maintenance
Term Contract
Results
$11,130 est. value
Albany, GA 31702

Annual Contract for Closed Circuit Television Inspections
Term Contract
Post-Bid
GA

Last Updated 04/01/2022 07:51 AM
Project Title

Sewerage System Improvements

Physical Address View project details and contacts
City, State (County) Senoia, GA   (Coweta County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of furnishing all materials, equipment and labor for the construction of the following sewerage system improvements: 1. Division One: Construction of approximately 4,220 linear feet of 24-inch PVC and ductile iron interceptor sewer, all complete with appurtenances. 2. Division Two: Construction of approximately 2,250 linear feet of 16-inch PVC effluent force main and 1,900 linear feet of 8-inch ductile iron water line, all complete with appurtenances. 3. Division Three: Construction of approximately 2,725 linear feet of 10-inch PVC force main, all complete with appurtenances. 4. Division Four: Dig and replace approximately 1,142 linear feet of 8-inch gravity sewer line with 1,020 linear feet of 12-inch and 122 linear feet of 15-inch gravity sewer, remove and replace manholes and construct new manholes, all complete with appurtenances. Bypass pumping will be required.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents