Similar Projects
Water Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Savannah County Road 58 Phase V
Bidding
TX

Water Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Savannah County Road 58 Phase V
Bidding
TX

McHard Road Trunk Sewer and Phase 2 Waterline Trunk Sewer - Cullen to Garden Waterline Phase 2 - Cullen to Mykawa
Post-Bid
Pearland, TX 77581

McHard Road Trunk Sewer and Phase 2 Waterline Trunk Sewer - Cullen to Garden Waterline Phase 2 - Cullen to Mykawa
Post-Bid
Pearland, TX 77581

Water Distribution, Sanitary Sewer, and Storm Drainage Facilities to Serve Newport Lake Estates, Section 2
Results
TX

Water Distribution, Sanitary Sewer, and Storm Drainage Facilities to Serve Newport Lake Estates, Section 2
Results
TX

Aboveground and Underground Utility Location Service for the TXDOT Houston District
Term Contract
Bidding

Construction of the 2019 Railroad Water Line Crossing
Post-Bid
Brazoria, TX

Sierra Vista West Section 1 Water, Sanitary, and Drainage Facilities
Results
Less than $1,400,000 est. value
TX

Manvel Town Center Water Line Interconnect
Bidding
Manvel, TX 77578

Veterans Drive Lift Station Abandonment
Post-Bid
Pearland, TX

Water Line Extension to Serve Drever Larkspur Pearland
Results
TX

High Density Polyethylene Pipe, High Performance Polypropylene Pipe and Fitings
Bidding
Angleton, TX

Velasco Terminal Backland Development, Area 3
Post-Bid
Freeport, TX 77541

Fairway and South Water Line Improvements
Results
$1,600,000 to $1,700,000 est. value
Alvin, TX

Reported 05/01/2019 12:00 AM
Project Title

2019 Highway 59 Utility Relocation

Physical Address View project details and contacts
City, State (County) El Campo, Jones Creek, TX 77437 (Brazoria, Wharton Counties)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $510,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description Furnish and install approximately 1,900 linear feet of new 12” PVC gravity sanitary sewer line, 2350 linear feet of new 12” PVC water line, manholes, valves, service connections and other appurtenances across Highway 59 in El Campo, Texas.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents