Similar Projects
New Southern Illinois University Campus - Southern Illinois University School of Medicine
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Springfield, IL 62703

Kiwanis Park Improvements
Infrastructure
Design
$800,000 CJ est. value
Springfield, IL 62703

Kiwanis Park Improvements
Infrastructure
Design
$800,000 CJ est. value
Springfield, IL 62703

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Sugar Creek WWTP CSO Improvements Project
Infrastructure, Renovation
Bidding
$7,767,000 CJ est. value
Springfield, IL 62703

Milling, Patching, and Resurfacing
Infrastructure
Post-Bid
Springfield, IL

Commvault Maintenance Renewal
Alteration
Post-Bid
Springfield, IL

RR-21-4821 Pavement Repairs
Infrastructure
Results

Liquid Asphalt
Infrastructure
Results
Springfield, IL

Lincoln Land Energy Center / Pawnee
New Construction, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Pawnee, IL 62558

Lincoln Land Energy Center / Pawnee
New Construction, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Pawnee, IL 62558

FY2024 Sidewalk Program
Infrastructure
Bidding
$127,000 CJ est. value
Springfield, IL 62703

FY2023 Concrete Patching
Term Contract, Infrastructure, Alteration
Post-Bid
Springfield, IL

5.4 Miles of Standard Overlay on i-55 South of the Sangamon / Montgomery County Line to Brush Creek 0.7 Miles South of Il 104 and on Brown Street / East Divernon Road East of State Street in Divernon to 0.1 Miles East of Sullivan Road
Infrastructure
Results
Divernon, IL

Navigator CO2 Ventures Midwest Carbon Capture Sequestration
Infrastructure
Pending Verification
$2,000,000,000 CJ est. value
Chatham, IL 62629

Last Updated 03/15/2023 08:33 AM
Project Title

Patching on I-55

Physical Address View project details and contacts
City, State (County) Springfield, IL 62703   (Sangamon County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $671,885 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Patching on I-55 from the Montgomery County line to the Logan County line and on I-72 from the Morgan County line to the Macon County line. Region 4 District 6 Federal Project #NHPP-STP3EEX(645) County(s)Sangamon Key Route(s) FAI 55 FAI 72 Marked Route(s) I-55, I-72 Section(s) D6 PATCHING 2023 State Job #(s)C-96-019-23 PPS #(s)0-02177-6022 Completion Date: 15 Working Days Questions not accepted as of January 10, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, December 30, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 058 - Patching on I-55

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents