Similar Projects
Replace Chemical Storage Tanks
Term Contract, Alteration
Bidding
$36,400 est. value
FL

New Self Service AVGAS System
Infrastructure
Bidding
Punta Gorda, FL

Replace Fuel Tanks Patrick AFB FL
Post-Bid
$10,000,000 to $25,000,000 est. value
Cocoa Beach, FL 32931

Industrial Water Treatment Facility (IWTF) Tank Replacement
Post-Bid
Saint Petersburg, FL 33716

Pinkney Fuel Site Replacement Construction Management at Risk Services
Results
Sarasota, FL

Jet A 15,000 Gallon Bottom Load Fuel Tank System
Results
Lake City, FL

Orange County Convention Center Campus Diesel Tanks Replacement
Infrastructure
Bidding
$1,750,000 est. value
Orlando, FL 32819

Assetworks Fuel System (Fuelfocus), Inspection and Repair
Term Contract
Post-Bid
Less than $95,000 est. value
West Palm Beach, FL 33415

Maintenance, Testing and Repairs of Fuel Systems
Term Contract
Results
Less than $2,700,000 est. value
Orlando, FL 32801

3,000 Gallon Capacity Aboveground Diesel Storage Tank
Alteration
Bidding
$65,000 est. value
Apollo Beach, FL 33572

Northwest Water Reclamation Facility, Bleach Tank Replacement
Post-Bid
Saint Petersburg, FL 33710

Fuel Tank Repair at Brooksville Operations Center
Results
Brooksville, FL 34604

Oil and Gas Waste Stations
Infrastructure
Bidding
Less than $500,000 CJ est. value
Key West, FL

Stainless Steel Fuel Storage Tanks, Purchase and Delivery
Post-Bid
Palm Beach, FL

Pre-Qualification of Vendors for Maintenance and Repair of Fuel Systems Equipment
Term Contract
Results
Less than $150,000 est. value
Belle Glade, Pahokee, West Palm Beach, FL

Last Updated 11/05/2021 05:06 AM
Project Title

Replace Fuel Tanks City Public Works Yard

Physical Address View project details and contacts
City, State (County) Fernandina Beach, FL   (Nassau County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide 30 day and 48-hour notifications to the FDEP Provide engineered drawings as required for permitting Obtain any required permits (City will pay for permit fees) Disconnect existing electrical to (2) 2,000-gallon vaulted tanks Remove and dispose of all tank hardware Clean tanks and properly dispose of all petroleum contact water Provide necessary equipment for demolition of tanks Remove and dispose of (2) 2,000-gallon vaulted tanks Supply and install (1) 5,000-6000-gallon UL-2085, split compartment, double-walled, above ground tank Tank must be a Modern Welding AST or equivalent Anchor tank to the concrete slab (if the existing slab is structurally insufficient, the City will reinforce or re-pour the concrete slab) Install new steel piping to existing suction pumps All surfaces must be painted with a high-performance coating Provide and install new Morrison Brothers, or equivalent, mechanical fuel level gauges Provide and install interstitial sensor gauges Obtain final permits and completed site cleanup

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents