Similar Projects
Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Small Business Entrepreneur Park
Post-Bid
Dublin, GA 31040

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

Road Widening
Infrastructure
Post-Bid
GA

Widening and Resurfacing at Various Locations in Johnson and Laurens Counties
Results

Stubbs Park Road Improvements
Infrastructure
Post-Bid
Dublin, GA

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

2021 LMIG Project
Results
Mount Vernon, GA

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Paving
Results
East Dublin, GA

Paving of Various Roads
Infrastructure
Results
Dublin, GA

2021 Street Resurfacing
Infrastructure
Results
Dublin, GA

Crack Seal, Pavement Rejuvenation, and Remarking
Infrastructure
Results
GA

Last Updated 06/10/2022 02:01 AM
Project Title

Lowery Firehouse Road Resurfacing

Physical Address View project details and contacts
City, State (County) GA   (Laurens County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 5.45 miles (60,800SY) of surface treatment resurfacing and striping using #7 and #89 stones along with a Cationic Polymer Modified Rapid Curing Fog Seal on Lowery Firehouse Road beginning at HWY 19 and ending at the intersection of Hwy 46. Fog seal shall be placed on project within one week of #89 stone placement. o Pavement width is 20 feet o Fog Seal applied at rate of .12 gallons per SY over top of #89 stone o Resurfacing will consist of #7, #89 o Temporary center line striping and permanent center and edge line striping @ 5" width

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents