Similar Projects
Rooftop Unit (RTU-3) Replacement at Weston Middle School - General
Alteration
Bidding
$300,000 est. value
Weston, MA 02493

HVAC System Replacements at Ripley Elementary School - HVAC - General Bids
Alteration
Bidding
$765,000 est. value
Concord, MA 01742

Well 4 Water Treatment Plant Upgrades - Filed Sub-Bids
Alteration
Sub-Bidding
$4,500,000 est. value
Maynard, MA

Cambridge Electrical Department - The Shop - Slab Replacement - Sub Bid
Alteration
Sub-Bidding
$1,000,000 est. value
Cambridge, MA 02141

Routine and Emergency Repair and HVAC Maintenance Services for Municipal Buildings
Term Contract
Post-Bid
North Reading, MA

On-Call Services for Repairs to HVAC Systems in City Owned Buildings
Post-Bid
Less than $150,000 est. value
Woburn, MA

HVAC Maintenance and Repair Services
Results
Natick, MA 01760

Rehabilitate Visitor Center HVAC System, LOWE
Results
$500,000 to $1,000,000 est. value
Lowell, MA

Attic Insulation, Ventilation and Air Sealing Musketahquid Village Elderly Development
Alteration
Bidding
$100,618 est. value
Sudbury, MA 01776

Morse Library HVAC and Controls Upgrades - Sub Bid
Alteration
Sub-Bidding
Natick, MA 01760

Maintenance and Repair of HVAC for Various Schools
Post-Bid
Everett, MA

J041--Inspect and Clean Ductwork Bedford Massachusetts VAMC
Results
Bedford, MA 01730

Morse Library HVAC and Controls Upgrades - General Bid
Alteration
Bidding
Natick, MA 01760

Station 4 Air Conditioning Project
Post-Bid
Less than $125,000 est. value
Reading, MA 01867

Scheduled and Emergency HVAC System Repairs and Improvements at Various Locations
Results
$127,050 est. value

Reported 04/01/2022 12:00 AM
Project Title

Chiller Replacement Billerica Town Hall - General Bids

Physical Address View project details and contacts
City, State (County) Billerica, MA 01821   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,291,381
Plans Available from Copy Center - 03/09/22
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. The project consists of installing a new chiller on the roof and removing the existing one in the basement. The other structural, electrical, plumbing, HVAC upgrades required for this project are shown in the bid documents. The Town employees and public will use the building during the construction period. Therefore, the Prime HVAC Contractor shall take all necessary precautions during construction.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents