Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Chiller Replacement
Results
Edwardsville, IL 62025

Renovate and Expand Building/Construct Cold Storage Buildings - Ventilation
Renovation, Addition
Results
Less than $150,000 est. value
Bethalto, Hamel, IL

HVAC Services
Term Contract, Alteration
Post-Bid
Collinsville, IL

Madison School HVAC Modifications
Alteration
Results
Madison, IL 62060

Air Purifier Systems for the Classrooms
Alteration
Post-Bid
Godfrey, IL

Replacement Roof Top Air Conditioner/Furnace
Alteration
Results
Edwardsville, IL 62025

Heat Exchanger Replacement
Alteration
Post-Bid
East Alton, IL 62024

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

Weatherization HVAC / Plumbing / Electricians
Term Contract
Post-Bid
IL

Morris University Center AHU S-1 Replacement
Renovation, Infrastructure
Results
Edwardsville, IL 62025

HVAC and Mechanical System O&M, Repair, and Replacement Blanket Purchase Agreement (BPA) - Service Base
Term Contract
Post-Bid
Alton, Granite City, IL - Clarksville, Saint Louis, West Alton, Winfield, MO 63118

Chilled Water Piping Replacement SFC
Renovation, Alteration
Results
Edwardsville, IL

Weatherization (IHWAP) Program
Term Contract
Post-Bid

Last Updated 05/17/2022 04:57 PM
Project Title

DHS AMHC - Water Cooler Install

Physical Address View project details and contacts
City, State (County) Alton, IL 62002   (Madison County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of thirty-six (36) water coolers with new Elkay model #LZS8WSLP water coolers including bottle filling station which the facility will supply. Current coolers will be retained by the Facility after removal. Successful bidder is responsible for hanging coolers, hook up of water and drain, electrical connection and any alterations to existing connections needed to meet manufacturer specs. Successful bidder will remove existing bubbler from twenty-two (22) of the existing water coolers and reinstall on new models. Work will take place in multiple buildings.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents