Similar Projects
The Ave Redevelopment
New Construction, Renovation - 21,000 SF
Conception
$25,300,000 est. value
Chicago, IL 60651

Children's Land Daycare
Renovation - 14,000 SF
Design
Park Ridge, IL

Montessori Academy Spanish Immersion
Renovation
Design
Oak Park, IL 60302

CPS Dunning-Forest Glen Pre-K
Build-Out
Bidding
$6,000,000 est. value
Chicago, IL 60634

NACC - By The Hand Bid Package 1
New Construction - 140,000 SF
Post-Bid
$10,000,000 CJ est. value
Chicago, IL 60639

Child Day Care Center - Playground
Renovation, Build-Out - 2,400 SF
Post-Bid
South Holland, IL 60473

Pre-K C Citywide
Renovation
Results
Chicago, IL 60614

Pre-K at Vick Village
Renovation
Results
Chicago, IL 60629

Child Day Care Center
Build-Out - 15,000 SF
Construction
$3,000,000 to $4,000,000 est. value
Park Ridge, IL 60068

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

North Milwaukee Mixed Use Development
Renovation - 125,000 SF
Pending Verification
Chicago, IL 60641

East Garfield Park Supportive Housing
New Construction
Pending Verification
Chicago, IL 60624

2021 Kindergarten Work at Multiple Site
Post-Bid
Wheeling, IL 60090

CPS Dirksen ES Pre-K
Renovation
Results
Chicago, IL 60656

Foresight Children Learning Center
Renovation - 2,930 SF
Construction
$10,000 to $22,000 est. value
Oak Forest, IL 60452

Last Updated 02/15/2022 11:26 PM
Project Title

CPS Morgan Park/Beverly Pre-K

Physical Address View project details and contacts
City, State (County) Chicago, IL 60643   (Cook County)
Category(s) Education
Sub-Category(s) Pre-School/Daycare
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation to the existing building to include 6 new Pre-K classrooms, Administration offices, bathrooms, new central stairs, new CPS office at the lower level and 2nd floor. Work includes: All new HVAC system, Chiller, RTU’s, Ductwork, VAV boxes and Boilers. All new plumbing, and electrical. All new high efficiency lighting. New roof system. Existing exterior repairs to the below grade waterproofing, repairs to exterior masonry columns, and a new exterior stair railing. New accessible sidewalk, parking and drop off area. New playground and playground equipment. New landscaping.

Details

Pre-School/Daycare, Build-Out.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents