Similar Projects
HVAC Work Replace Pumps, Heat Exchangers and Domestic Water Chiller
Renovation
Sub-Bidding
$3,000,000 CJ est. value
Albany, NY 12210

Heating Unit Replacement
Alteration
Post-Bid
$6,500 est. value
Watervliet, NY 12189

HVAC Preventative Maintenance
Alteration
Post-Bid
Albany, NY

J041--528A8-19-807 Replace Cooling Towers 1 & 2
Results
$1,000,000 to $5,000,000 est. value
Albany, NY

H141--HVAC Maintenance & Repair Services
Results
Albany, NY

William K. Sanford Town Library HVAC Project 2021
Alteration
Post-Bid
Loudonville, NY

J041--HVAC Controls & BAS Full Maintenance & Repair Services
Results
Albany, NY

Heating Unit Replacement
Alteration
Post-Bid
Albany, NY 12206

Term Contract for Plumbing/HVAC
Term Contract
Results
Albany, NY

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Industrial HVAC Critical Infrastructure Repair Technicians
Results
Albany, NY

Heating Unit Replacement
Alteration
Post-Bid
$6,500 est. value
Albany, NY 12205

Chiller Maintenance at Empire State Plaza Central Air Conditioning Plant
Results
Albany, NY

Job Order Contracting - Area 4 - HVAC
Alteration
Post-Bid
$500,000 to $1,000,000 est. value
Albany, NY 12210

HVAC and DDC Control Services
Results
Albany, NY

Last Updated 10/05/2022 04:12 PM
Project Title

HVAC Work Replace Switchgear Swan Street Building Empire State Plaza

Physical Address View project details and contacts
City, State (County) Albany, NY 12242   (Albany County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Replace Switchgear - HVAC Work MBE Goals C Trade: 5% E Trade: 10% H Trade: 4% WBE Goals C Trade: 5% E Trade: 10% H Trade: 4% SDVOB Goals C Trade: 6% E Trade: 6% H Trade: 3% Contract term: 1080 Days Bidders and must be accompanied by a bid security (i.e. certified check, bank check, or bid bond in the amount of $8,500 for C, $18,200 for H, and $158,200 for E). All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract estimated to be between $100,000 and $250,000 for C, between $250,000 and $500,000 for H, and between $6,000,000 and $7,000,000 for E. The Office of General Services reserves the right to reject any or all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents