Similar Projects
Rehabilitation of Screened Final Effluent (SFE) Pump Station - 216008 - The Great Lakes Water Authority
Infrastructure, Alteration
Conception
Less than $35,607,000 est. value
Detroit, MI 48209

2022-2024 DWRF Watermain Replacement Program
Infrastructure
Bidding
$300,000 est. value
Hamtramck, MI

2022 DWRF Caniff Street Phase 2 Joseph Campau To Conant
Infrastructure
Bidding
$200,000 est. value
Hamtramck, MI 48212

Water Storage Distribution System (WSDS)
Post-Bid
Detroit, MI

Water Meter Installation
Term Contract
Post-Bid
Detroit, MI

World-Wide Water Storage Tank Remediation
Term Contract
Results

2021 Water Main and Sewer Repair Contract
Results
Ecorse, MI

2022 DRWF Joseph Campau Watermain Looping
Infrastructure
Bidding
$300,000 est. value
Hamtramck, MI 48212

Underground Storage Tank Assessment and Recommendation Services
Infrastructure
Post-Bid
Detroit, MI

2020 Water Main Replacement Multiple Locations
Results
Grosse Ile, MI 48138

2022 DWRF Caniff Street Watermain Phase 1 Conant to Buffalo
Infrastructure
Bidding
$200,000 est. value
Hamtramck, MI 48212

Water Meter Replacement Program
Infrastructure
Post-Bid
Ecorse, MI

Replacement of Pavement and Water Mains
Results
$2,250,000 est. value
Allen Park, MI 48101

2022-2024 DWRF Lead Service Line Replacement (LSLR) (Watermain Replacement DWRF Loan)
Infrastructure
Bidding
$200,000 est. value
Hamtramck, MI

Cold Water Single Register Mech Type 2 Inch Meters
Infrastructure
Post-Bid
Detroit, MI

Last Updated 07/18/2022 07:20 AM
Project Title

7 Mile Water Tower and Vault Modifications

Physical Address View project details and contacts
City, State (County) Northville, MI 48167   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing 0.5 million gallon elevated water tower, and associated utilities, including water main and construction of two new valve vaults and other valve vault modifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents