Similar Projects
Costner School Road Residential
New Construction
Conception
Bessemer City, NC 28016

Rhyne Terraces
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Gastonia, NC 28052

Central Park South
New Construction - 57,070 SF
Design
Belmont, NC 28012

Kendrick Townhomes
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Gastonia, NC 28052

Oak Commerce Center - Building I
New Construction, Infrastructure - 471,860 SF
Bidding
$30,600,000 CJ est. value
Belmont, NC 28056

Vantine Pump Station and Sewer Replacement
Renovation, Infrastructure
Bidding
$1,800,000 CJ est. value
Bessemer City, NC 28016

Rehabilitation Of Residential Property
Renovation
Post-Bid
Gastonia, NC 28052

Oak Commerce Center - Building I
New Construction, Infrastructure - 471,860 SF
Post-Bid
$30,600,000 CJ est. value
Belmont, NC 28056

Community Services Department Rehabilitation Program - Housing Rehabilitation
Renovation
Results
$5,001 to $25,000 est. value
Gastonia, NC 28052

Water System Extension to Serve Paul Beam Road Area Near Cherryville
Infrastructure
Results
$997,018 CJ est. value
Cherryville, NC 28021

Premix Inc. Manufacturing Plant
New Construction, Infrastructure - 66,000 SF
Construction
$50,000,000 CJ est. value
Dallas, NC 28034

Belmont Abbey College
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Belmont, NC 28012

Howe's Landing
New Construction, Infrastructure
Pending Verification
$340,000,000 CJ est. value
Gastonia, NC 28056

Howe's Landing
New Construction, Infrastructure
Pending Verification
$340,000,000 CJ est. value
Gastonia, NC 28056

Sewer Expansion - Southern I-85 Area - Davidson County
Infrastructure
Conception
$38,423,583 CJ est. value
Bessemer City, NC 28016

Last Updated 07/13/2023 10:20 AM
Project Title

Henry Chapel Community

Physical Address View project details and contacts
City, State (County) Belmont, NC 28012   (Gaston County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $246,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a residential subdivision. As of July 13, 2023, this project is in the early planning stages, and zoning applications and schematic plans are under review. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents