Similar Projects
Hamilton Park Apartments
New Construction
Conception
Greenwood, SC

Pecan Ridge Event Venue
Renovation
Conception
Clover, SC 29710

Long Savannah - Master Plan
New Construction
Design
Charleston, SC

Carolina Forest Senior Center
New Construction - 5,000 SF
Design
$1,200,000 est. value
Myrtle Beach, SC 29579

Construction Manager at Risk for Beaufort Academy - Phase I
New Construction, Addition - 56,500 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Beaufort, SC 29901

Hightower Hall Structural Repair
Post-Bid
McConnells, SC 29726

St. Julian Devine Community Center Park and Building Renovations
Renovation
Results
Charleston, SC

Northwest Park Community Center Renovations
Renovation
Results
Florence, SC 29501

Saint Andrew Catholic Church Parish Hall
New Construction - 5,953 SF
Construction
$4,800,000 est. value
Clemson, SC 29631

YMCA
New Construction - 68,626 SF
Construction
$3,000,000 est. value
Indian Land, SC

The Village at Poe Mill
New Construction, Renovation
Conception
Greenville, SC

Chandler Reserve
New Construction - 1,600 SF
Design
$20,000,000 est. value
Florence, SC 29501

Jones Recreation Center and Park West Pool Building Locker Room Repair and Refinishing
Post-Bid
Mount Pleasant, SC 29466

Boys and Girls Club Pavilion Construction
Results
Less than $285,576 est. value
Hilton Head Island, SC

The 9 at Columbia
New Construction - 9,180 SF
Construction
Columbia, SC

Last Updated 03/12/2020 04:13 PM
Project Title

Construction Manager at Risk for Halton Road Renovations

Physical Address View project details and contacts
City, State (County) Greenville, SC 29601   (Greenville County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The building 3 and 4 Phase 1 scope will have eight (8) Family Court Rooms and their associated support spaces (judges’ chambers, attorney interview rooms, waiting areas, etc.). The project will also include operational spaces for the Clerk of Court, records, payment, Department of Juvenile Justice, etc. There is a lower level floor dedicated to Probation and Parole relocation included in the Phase 1 scope. The lower level of the Judges floors will have a holding area with new prisoner elevators. The judge’s floors will also have an exterior new elevator and stair tower for controlled secure circulation. The two floors of courtrooms will be similar floor plates with duplicated layouts. The existing buildings are steel framed pre-cast and glass clad three stories with lower levels having partial basement retaining walls. The buildings are fully sprinkled, and major systems are intended to remain. The County proposes to install security data cabling and FF&E on their own managed project. Coordination will be required of the contractor for this owner designed data rework. The finishes inside are primarily proposed to be replaced. The existing toilet cores are newly renovated and shall remain. Duct work will be reworked to accommodate raised ceilings in Judges Courtrooms. Lights, ceilings and ceiling grids are proposed to be replaced. Some site work involves new dumpster area, security bollards, and fencing. New data conduits for building connectivity will be provided by the contractor. The parking lots are to remain as is with the exception of a few repairs. Some mechanical upgrades are proposed including reworking and running new ducts, VAV boxes and associated controls.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents