Similar Projects
Fuel Farm Improvements - Phase III - General Bid
Bidding
$1,700,000 est. value
Nantucket, MA 02554

Fuel Farm Improvements - Phase III - Filed Sub-Bid
Bidding
Less than $1,700,000 est. value
Nantucket, MA 02554

Fuel Storage and Day Tank Systems Replacement - Gillis Pump Station, Hayes Pump Station and Lexington Street Pump Station - General Bids
Post-Bid
Less than $1,729,000 est. value
Stoneham, Wakefield, Waltham, MA

Replace Tanks, Furnace, and Hydro Heaters at Buffumville Lake, Charlton, MA
Post-Bid
Charlton, MA

Removal of 7500 Gallons Above Ground Tank
Results
Boston, MA

Install New Liner on Sodium Hypochlorite Tank
Results
Less than $24,000 est. value
Boston, MA

Removal and Disposal of Two 10,000-Gallon Heating Oil Tanks at Marsh Grammar School
Bidding
Methuen, MA 01844

Shrewsbury Pump Station Underground Storage Tank Removal Project
Post-Bid
Less than $30,000 est. value
Shrewsbury, MA 01545

Underground Storage Tank Removal and Installation of Three Above Ground Storage Tanks - General Bid
Results
Less than $195,000 est. value
Nantucket, MA 02554

Underground Storage Tank Upgrades at the Everett Department of Public Works
Post-Bid
Less than $133,000 est. value
Everett, MA 02149

Removal and Installation of Three Above Ground Storage Tanks - Filed Sub-Bids
Results
Less than $195,000 est. value
Nantucket, MA 02554

Materials for Gas Construction
Post-Bid
Less than $100,000 est. value
Westfield, MA 01085

WPCF Fuel Tank Installation
Results
Less than $15,000 est. value
Montague, MA 01351

Annual Aviation Fuel Farm Inspections and Maintenance Services
Post-Bid
Less than $130,000 est. value
Nantucket, MA

Gas Construction Contractor Annual Contract
Term Contract
Results
Holyoke, MA 01040

Last Updated 03/11/2020 10:08 AM
Project Title

Removal and Disposal of Underground Tank at Broad Meadow Middle School

Physical Address View project details and contacts
City, State (County) Quincy, MA   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $27,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and disposal of one closed underground storage tank and related piping located at Broad Meadows Middle School. Tank shall be removed over the 2/14/20 - 2/24/20 school vacation break.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents