Similar Projects
Last Updated | 11/21/2022 08:33 AM |
Project Title | Bus Shelters Pad Construction Contract |
Physical Address | View project details and contacts |
City, State (County) | Avon, CO 81620 (Eagle County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $202,969 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of six (6) concrete bus shelter pads and setting a new pre-fabricated bus shelter on each pad per engineered drawings. Surveying, saw cutting, excavation and disposal of existing concrete, shallow utilities and possible sprinkler line relocation, seeding/mulching, and safety barricades to control traffic and pedestrians are the general tasks required. All are located at existing bus stops in the Town of Avon as follows: - Shelter #1 Loaded Joe's - 180 Benchmark Road - Shelter #2 ANB Band - 70 Beaver Creek Place - Shelter #3 Avon Crossing/Canyon Run - 0170 Hurd Lane - Shelter #4 Eagle Bend North - 4650 Eagle Bend Drive - Shelter #5 West Gate Plaza - West Beaver Creek Blvd. - Shelter #6 Buffalo Ridge West - Building 3 Swift Gulch Road Job Location Town of Avon General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Labor and Materials Bond 100 % - Payment Bond 100 % |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |