Similar Projects
Spencerport CSD 2018 Capital Project Phase 2
Post-Bid
Spencerport, NY

Renovations to World of Inquiry School #58
Renovation
Post-Bid
Rochester, NY 14605

Renovations to School No. 19 and School No. 20
Renovation
Results
Rochester, NY 14608

Renovations to Charles Carroll School No. 46
Renovation
Results
Rochester, NY 14610

SPRY Middle School and Buildings and Grounds
Construction
Webster, NY 14580

Gates Chili CSD 2017 Capital Improvement Project Middle School Phase 1.3
Construction
Rochester, NY 14624

Phase II Construction of Electric Bus Infrastructure
New Construction
Post-Bid
Rochester, NY 14609

Renovations to John Williams School No. 5
Renovation
Results
Rochester, NY 14605

Rochester Prep Mark Street Campus
Addition - 35,000 SF
Construction
Rochester, NY 14605

Gymnasium And Science Lab Addition
Addition, Demolition - 18,535 SF
Post-Bid
Rochester, NY 14612

Renovations to School of the Arts
Renovation
Results
Rochester, NY 14614

Fairport CSD 2019 Capital Improvement Project Phase 1A
Renovation
Construction
Less than $21,000,000 est. value
Fairport, NY 14450

Honeoye Falls - Lima CSD Phase 2.5C - 2019 Middle School Capital Improvement Project
Renovation
Post-Bid
$750,000 est. value
Honeoye Falls, NY 14472

Renovations to District Central Office and Early Childhood Education Center
Renovation
Results
Rochester, NY 14614

Renovations to Franklin Educational Campus
Renovation
Construction
Rochester, NY 14621

Last Updated 04/01/2022 08:26 AM
Project Title

East Irondequoit CSD 2019 Capital Improvement Project - Phase 2

Physical Address View project details and contacts
City, State (County) Rochester, NY 14622   (Monroe County)
Category(s) Education, Transportation
Sub-Category(s) Middle/Senior High School, Misc. Structures
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $3,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General Construction - $3,300,000 HVAC - $1,100,000 Electrical - $1,200,000 Plumbing - $200,000 Site Work - $2,000,000 The project consists of major renovations and improvements: Eastridge Senior High School SED# 26-08-01-06-0-002-025, Transportation Building SED# 26-08-01-06-5-016-004 At The High School: The Eastridge Senior High School campus is located at: 2350 East Ridge Road, Rochester, New York 14622. The project consists of major interior renovations with abatement of pipe insulation, existing VAT flooring, mastic, wall base and plaster ceilings along with removal of radiant ceiling panel systems in various Classrooms. General renovations include full renovations to various Classrooms with upgrading finishes throughout. Also included is full replacement and modifications of the HVAC systems at various locations along with upgrades to electrical, power, data and panels and replacement of lighting throughout. The project also includes upgrades to existing athletic field stadium lighting controls, installation of a new synthetic turf softball fields, dugouts, and associated hardscaping, new landscaping and overall asphalt and lawn restorations. At Transportation Building: The Transportation Building is located at: 125 Kane Drive, Rochester, New York 14622. The project consists of full replacement of the existing bus lifts (new lifts provided by the District) and associated concrete pit foundations, footings, and slab on grade within the bus garage. The project also includes modifications to the existing radiant heating flooring systems at both the interior and partial exterior of the Transportation Building. Also included is installation of new trench drains and underground storm piping connections to existing storm outlets along with upgrades to electrical panels, devices and new power outlets associated with the new bus lifts. The project also includes renovations and fit out of the existing covered storage area which includes new masonry and steel panel exterior wall enclosures with overhead doors, concrete slab on grade, and trench drains.

Details

Middle/Senior High School, Renovation, Misc. Structures, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents