Similar Projects
New Winona County Jail Building
New Construction
Post-Bid
Winona, MN 55987

2022 Seasonal Work and Materials
Term Contract
Post-Bid
Faribault, MN

Replace Two Elevators at MCF - General
Renovation
Results
$944,835 est. value
Moose Lake, MN 55767

Glenwood Area Office Storage Building- Electrical
Results
$32,925 est. value
Glenwood, MN

Traffic Signal Cable
Infrastructure
Post-Bid
Minneapolis, MN

Law Enforcement Center 3100 and 7100 Cell Block Improvements
Renovation
Results
$500,000 est. value
Hastings, MN 55033

Emergency Generator Maintenance M-547
Term Contract
Post-Bid

2021 St. Paul Shelter Electrical Connections
Alteration
Results
Saint Paul, MN

LED Lighting Upgrades
Alteration
Post-Bid
Le Roy, MN 55951

50th Street West and Broadway Street Northeast Signal - Pedestrian Improvements and Fiber
Alteration
Results
$175,000 est. value
Minneapolis, MN 55467

Bde Maka Ska Refectory
New Construction, Infrastructure
Results
Minneapolis, MN 55408

Fridley Campus Medium Voltage Adjustable Frequency Drive (MV AFD) and Variable Frequency Drive (VFD)
Infrastructure
Results

Street Light Service Cabinets
Alteration
Results
Minneapolis, MN

2022 Masonry Restoration - Phase 3 at Men's Adult Correctional Facility
Renovation
Results
$490,000 est. value
Plymouth, MN 55447

Generator Replacement at St. Peter RTC
Renovation
Results
$459,000 CJ est. value
Saint Peter, MN 56082

Last Updated 08/01/2022 01:15 AM
Project Title

Replace PLC Controls Minnesota Correctional Facility - Faribault

Physical Address View project details and contacts
City, State (County) Faribault, MN 55021   (Rice County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Electric, Prison/Jail
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $205,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PN-212204 Site Directions: 1101 Linden Lane, Faribault, MN 55021 REBID #2 Replace PLC Controls at Minnesota Correctional Facility - Faribault This project is Targeted Group/Economically Disadvantaged/Veteran-Owned (TG/ED/VO) certified small business preference. A. The work will done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) All engineering, equipment, labor, programming and permits required to satisfactorily complete the following improvements related to the PLC controls replacement of medium-voltage equipment at the MCF-Faribault facility. Existing power generator and power transfer equipment is in good shape and can be reused. The PLC controls for the medium-voltage paralleling gear and related equipment are failing and require replacement. Contractor shall replace contents of PLC controls cabinet and program the system similar to existing. Existing schematics information will be provided for system details. Pre-registration is required. All attendees are required to email jmedeiros@woldae.com and karl.hunt@state.mn.us by 12:00 PM CST on Friday, July 15, 2022 indicating their intent to attend the pre-bid meeting. Contractors must complete the background check and consent forms provided in Section 00 73 02 and submit to karl.hunt@state.mn.us with a photo of a valid driver's license by 12:00 PM CST on Friday, July 15, 2022. Responses received from Prime Contractors (including electrical contractors bidding as a prime) that did not attend a mandatory pre-bid meeting will be rejected. NOTE: Prospective contractors that attended the first pre-bid meeting on March 15, 2022 or the second pre-bid meeting on June 8, 2022 are NOT required to attend the re-bid #2 meeting to submit responses. Contractor questions must be submitted to Wold Architects & Engineers by 4:00 PM CST on Tuesday, July 26, 2022. Questions can be emailed to jmedeiros@woldae.com and bjohannsen@woldae.com. The State is not obligated to answer questions submitted after the question due date and time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents