Similar Projects
Elvis Presley Birthplace Event Center Overlook
Infrastructure
Design
$500,000 CJ est. value
Tupelo, MS 38804

Tupelo SRF FY22 B&B Sewer Replacement
Infrastructure
Bidding
$1,300,000 CJ est. value
Tupelo, MS 38804

Endville Road Widening/ Safety Improvements
Infrastructure
Bidding
$6,000,000 CJ est. value
Tupelo, MS 38826

Booneville/Baldwyn Airport Runway and Taxiway Overlay
Infrastructure
Post-Bid
$2,261,723 CJ est. value
Baldwyn, MS 38824

Mcneese St. Pipe Lining Culvert Improvement
Infrastructure
Post-Bid
$225,000 CJ est. value
Tupelo, MS 38804

Roadway Maintenance Program - 2022 Annual Bid
Term Contract
Results
Tupelo, MS

Construction of 0.084 Miles of Precast Concrete Span Bridge and Approaches to Replace Bridge No. 181 on CR 1149
Demolition, New Construction, Infrastructure
Results
$505,484 CJ est. value
Tupelo, MS 38804

Booneville-baldwyn Airport 12,000 Gallon Jet-a Fuel Tank Rebid
Renovation, Infrastructure
Construction
$289,000 CJ est. value
Baldwyn, MS 38824

Construction of 0.208 Miles of Precast Bridge and Approach
Infrastructure
Bidding
$300,000 CJ est. value
Saltillo, MS 38866

Construction of a Satellite Fire Station
New Construction, Infrastructure
Post-Bid
$1,800,000 CJ est. value
Baldwyn, MS 38824

Rtp Recreational Trail
Infrastructure
Results
$58,547 CJ est. value
Tupelo, MS 38804

Construction of Tupelo SRF FY21 Central Pumping Station Modifications Contract
Addition, Infrastructure
Bidding
$1,200,000 CJ est. value
Tupelo, MS 38804

Construction of Wastewater Collection System Addition
Infrastructure
Post-Bid
$877,167 CJ est. value
Guntown, MS 38849

Construction of Widening and Overlay at College Avenue
Infrastructure
Results
$253,406 CJ est. value
Verona, MS 38801

Wastewater Collection System Addition
Infrastructure
Post-Bid
$317,360 CJ est. value
Guntown, MS 38849

Last Updated 08/25/2023 12:01 AM
Project Title

Elevated Water Storage Tank Repair and Repaint

Physical Address View project details and contacts
City, State (County) Tupelo, MS 38804   (Lee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $7,200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

COOK COGGIN IS NOT RESPONSIBLE FOR THIRD PARTY DOCUMENT DISTRIBUTION. BIDS WILL BE ACCEPTED ONLY UNDER THE NAME OF THE BIDDER TO WHOM CONTRACT DOCUMENTS HAVE BEEN ISSUED BY PLAN HOUSE PRINTING, ON BEHALF OF THE ENGINEER, AND WHOSE NAME APPEARS ON THE OFFICIAL LIST OF PLANHOLDERS MAINTAINED BY PLAN HOUSE PRINTING THE HARD COPY PURCHASE AND DIGITAL DOWNLOAD OPTION WILL BECOME AVAILABLE WHEN THE DOCUMENTS HAVE BEEN APPROVED BY THE ENGINEER AND HAVE BEEN PLACED ON THE PLAN ROOM Repair & Repaint a 250,000 Gal. Welded Steel Elevated Water Storage Tank & Foundations 1 L.S. Pit Welding 15 SqFt Seam Welding 100 LinFt Seam Caulking 100 LinFt Bids will be accepted only under the name of the Bidder to whom contract documents have been issued by Plan House Printing or Central Bidding, on behalf of the Engineer, and whose name appears on the official list of Planholders maintained by the CITY OF TUPELO. Each bidder must deposit with this bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. For Bidders submitting bids electronically, the bond submitted must be either a bond issued by the Surety in electronic format or the original hard copy of the bid bond must be submitted to the CITY OF TUPELO, TAX OFFICE, ATTENTION: MISSY SHELTON, 71 EAST TROY STREET, TUPELO, MISSISSIPPI 38804, prior to bid opening in order for the bid to be valid. No Bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Simultaneously with his delivery of the executed contract, the Contractor shall furnish surety bonds subject to the conditions provided in the Information for Bidders. All applicable laws, ordinances and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout. Each Bidder is responsible for inspecting the site and for reading and being thoroughly familiar with the Contract Documents. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation in respect to this Bid. A conditional or qualified Bid will not be accepted. Award will be made to the lowest responsible, responsive Bidder. The Owner reserves the right to waive any informality or to reject any or all Bids.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents