Similar Projects
Water Tank Number 7 Cleaning and Painting
Infrastructure
Bidding
$460,000 est. value
Tallahassee, FL 32308

Richard A. Heyman Environmental Protection Facility Ferric Sulfate Tank Replacement and Gangway Replacement
Infrastructure
Bidding
Key West, FL

Pump W/1" NPT Ports
Post-Bid
Lakeland, FL

Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

North Regional Water Reclamation Facility Master Reuse Wet Weather Management Well System
Results
Palmetto, FL 34221

CR214 Well No. TR-50 Wellhead and Site Improvements
Infrastructure
Bidding
$700,000 est. value
FL

Unit 5 52 Circulating Water Pump Overhaul at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33805

Wetwell, Tank and Pipe Cleaning and TV Inspection Services
Results
Jacksonville Beach, FL

Effluent Pumps - Annual Contract
Term Contract
Bidding
FL

Wells and Pressure Tank Purchase and Installation Services
Post-Bid
Fort Pierce, FL 34945

Elevated Water Tank Coating
Results
Mascotte, FL 34753

Northwest Well No. 7 Wellhead and Site Improvements
Infrastructure
Bidding
$750,000 est. value
FL

Electric Motor Repair
Post-Bid
Cape Coral, FL 33915

Construction Moss Pilot Project
Results
West Palm Beach, FL

Last Updated 11/12/2021 09:32 AM
Project Title

West Water Reclamation Facility Temporary Storage Tank and Emergency Pump

Physical Address View project details and contacts
City, State (County) Winter Springs, FL   (Seminole County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide temporary water storage tanks and portable emergency pump for a minimum of a six (6) month rental period, which may be extended at the City’s option, mobilization of equipment to the site, set up of the emergency pump and accessories, demobilization from the site, spare parts, and maintenance of the tanks and emergency pump.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents