Similar Projects
Day Treatment & Mental Health Facility Construction
New Construction
Conception
Aurora, CO 80012

Boardwalk MOB
New Construction
Conception
Fort Collins, CO 80525

Clear Creek Crossing - Master Plan
New Construction
Design
Wheat Ridge, CO

Heartland Dental - Build Out - Parker
Build-Out - 4,114 SF
Design
Parker, CO 81001

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Community Health Clinic Project
New Construction
Results
Fort Collins, CO 80521

Additions and Renovations to the J.L. Voss Veterinary Teaching Hospital
Renovation, Addition
Results
$175,000,000 to $215,000,000 est. value
Fort Collins, CO 80525

Heartland Dental - Shell - Parker
New Construction - 4,200 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Parker, CO 81001

American Family Care #4513
Build-Out - 3,434 SF
Construction
$250,000 est. value
Denver, CO

Silverthorne Vet Clinic
New Construction - 12,360 SF
Pending Verification
$3,200,000 est. value
Silverthorne, CO 80497

Community Clinic
New Construction
Conception
Palisade, CO

Axis Health System - Cortez Integrated Healthcare Expansion
New Construction - 5,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Cortez, CO 81321

Activate: Dental Office Finish-Out
Renovation
Post-Bid
Fort Carson, CO

Octapharma Plasma
Renovation - 9,257 SF
Construction
$800,000 est. value
Aurora, CO

Reported 07/14/2022 10:33 AM
Project Title

Orthopaedic & Spine Center of The Rockies Medical Campus

Physical Address View project details and contacts
City, State (County) Greeley, CO 80634   (Weld County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method General Contractor to Subcontract.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value $33,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New construction of a medical facility in Greeley, Colorado. Working plans call for the construction of a medical facility. As of July 13 ,2022, this project is in design. The architect and the general contractor have been identified. Construction is expected to begin in October 2022.

Details

Medical Office/Outpatient, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents