Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Installation of Two RAHU (Air Handlers)
Post-Bid
Frederick, MD

Replace AHU, Building 429
Results
$250,000 to $500,000 est. value
Fort Detrick, MD

Exterior Duct Insulation, Building 469
Results
Frederick, MD

Modify Roof Exhaust Stacks and Attic Exhaust Ductwork in Building 560
Post-Bid
Frederick, MD

HVAC Maintenance and Service
Term Contract
Results
Less than $50,000 est. value
Frederick, MD

Replace Heat Exchangers / Condensate Pumps in Building 560
Post-Bid
Frederick, MD

B560 Roof Exhaust Stacks
Results
Frederick, MD

Campus Steam and Condensate Lines
Post-Bid
Fort Detrick, MD

Roof and HVAC System Replacement at 118 North Market Street
Results
$300,000 to $559,000 est. value
Frederick, MD 21701

Redundant Chiller, ATRF
Post-Bid
Frederick, MD 21701

41--Purchase & Install New Johnson Controls HVAC Controller Model Number MS-NAE5510-2
Results
Frederick, MD

B1049 HVAC Upgrades
Post-Bid
Frederick, MD

HVAC Improvements at Lincoln, Carver and Catoctin Manor Apartments
Results
Frederick, MD 21701

Replace Supply Air Handling Units
Post-Bid
Frederick, MD

Last Updated 05/16/2019 09:15 AM
Project Title

Public Safety Training Facility Roof Top Unit Insulation

Physical Address View project details and contacts
City, State (County) Frederick, MD   (Frederick County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description The Office of Facility Maintenance currently maintains a heating, ventilation, and air conditioning (HVAC) unit on the roof of the Public Safety Training Facility (PSTF). The unit's ductwork has existing closed cell insulation material that is not providing a sufficient insulating value allowing condensation to form between the insulation and the ductwork causing the system to leak into the building.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents