Similar Projects
Reported | 11/20/2021 12:00 AM |
Project Title | Civil, Site and Structural Improvements for Installation of the Second Track and New Maintenance of Way Yard |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: CT |
Category(s) | Transportation |
Sub-Category(s) | Railroad/Subway |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work consists of the civil, site and structural work required to build a second track between MP 48.3 and 49.3 as well as a new Maintenance of Way (MOW) Yard at MP 47.4 in Windsor Locks, CT on Amtrak’s Springfield Line. Work tasks to be performed as part of this project include: civil site work, subgrade work, installation of drainage, replacement of three culverts at MP 44.1, 48.87, 48.92 and 49.15, installation of soldier pile and lagging retaining walls, installation of precast panels to support track north and south of the Bridge St. intersection, installation of a pedestrian bridge, excavation and handling of contaminated materials, installation of electrical manholes, ductbanks and conduit for commercial power and Amtrak’s communication and signal cables. This project will require close coordination with adjacent projects by both Amtrak force account crews as well as CDOT contractors working on the Windsor Locks Station and the CSO siding projects. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |