Similar Projects
School Facilities Projects Phase 2
New Construction - 400,000 SF
Design
Less than $250,000,000 est. value
Gahanna, OH

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

LIC-Newark/Licking County Thoroughfare Plan
Infrastructure
Bidding

Metro at Indianola Middle And High School
Renovation, Infrastructure
Bidding
$28,887,142 est. value
Columbus, OH 43201

Miscellaneous Architect/Engineer Services in Support of Facilities Programs
Post-Bid
$1,000 to $3,000,000 est. value

Envelope Renovation
Post-Bid
Less than $305,000 est. value
Columbus, OH

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

Geotechnical Engineering Services
Results
$500,000 to $2,000,000 est. value

Commissioning Agent Services - Newton-Renovation and Addition
New Construction - 40,000 SF
Construction
$24,500,000 est. value
Columbus, OH

WOSU Headquarters and Studios
New Construction, Build-Out - 115,000 SF
Construction
$32,000,000 est. value
Columbus, OH 43201

Nestor Hall Auditorium Renovation
Renovation
Design
$5,116,856 est. value
Columbus, OH 43215

Riffe 6th Floor Labs Renovation
Renovation - 2,680 SF
Bidding
$629,258 est. value
Columbus, OH 43210

Waterman - Stream Restoration
Post-Bid
Less than $500,000 est. value
Columbus, OH 43210

Water Meter Installation FY 2019
Results
Less than $3,100,000 est. value
Columbus, OH

Parking Garage Upgrades
Renovation
Design
$4,000,000 est. value
Columbus, OH 43215

Reported 10/02/2021 12:00 AM
Project Title

VMC - Internal Med and Pharmacy Renovation

Physical Address View project details and contacts
City, State (County) Columbus, OH 43210   (Franklin County)
Category(s) Education, Professional Services
Sub-Category(s) College/University, Engineering
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $2,225,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1: Construction (Internal Medicine) Internal Medicine’s (IM) space no longer meets the needs of the department, and it is not adequately sized for their current caseload. Therefore, the VMC wishes to expand the footprint of their existing space by reassigning four adjacent exam rooms to IM. The IM space along with the four exam rooms will be renovated to increase IM’s current footprint from 770sf to approximately 1,485sf. The new IM space will include two learning conference rooms, workstations, examination bays and patient housing. During construction IM will relocate to swing space within the VMC and will move back once construction is complete. Phase 2: Construction (Pharmacy and Dermatology) The VMC wishes to improve Pharmacy’s workflow and create a customer facing prescription pick-up window. Pharmacy’s footprint will increase from 1,279sf to 1,593sf. Their new space will include external and internal pick-up windows, work area, dispensing space, drug storage, compounding, bulk storage, and receiving. Pharmacy will stay in their existing space until their new space is renovated. Dermatology’s new space will be built-out during this phase as well. Their space will increase from 582sf to 604sf and includes a treatment area and learning conference room. Dermatology and Cardiology will move to swing space within the VMC to allow for this phase of construction to occur. Pharmacy and Dermatology will move into their new space once this phase of construction is complete. Phase 3: Construction (Cardiology) Once Pharmacy vacates their current space it will be renovated to create the new Cardiology Department. Cardiology’s footprint will grow from 764sf to 1054sf and includes a treatment area, learning conference room and two echocardiogram rooms. Cardiology will move into their new space once construction is complete. This phase of construction concludes the project.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents