Similar Projects
Last Updated | 06/20/2023 12:19 PM |
Project Title | Request for Proposals Demolition Services |
Physical Address | View project details and contacts |
City, State (County) | Garrett Park, MD 20896 (Montgomery County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $35,222 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | *As of June 19, 2023 , This project has been awarded to RemacUSA, Inc. with the awarded amount of $35,222.00.** The scope of work includes, but is not limited to, demolition of the single-family residential structures (including any required abatement activities) and removal and disposal of any rubbish or debris on the property. The finished surface shall be reasonably smooth compacted and free from any irregular surface changes. Demolition will include the cost of final disposal of debris in a manner that complies with all local, state, and federal guidelines. In addition to the general requirements included in this Request for Proposals, the following conditions shall also be required: A. The Contractor shall remove structural framing members and lower them to the ground by utilizing a method suitable to avoid free fall and to prevent ground impact or dust generation. Where work is adjacent to the street, the Contractor shall conduct the work in a manner that will avoid the accumulation of debris from its operations on the traffic areas of the adjacent streets or roadways. Contractor shall continuously remove such accumulations and, where necessary, broom or wet down traffic areas to prevent dust. B. All demolition debris shall become the property of the Contractor. It shall be the Contractors responsibility to remove and dispose of from the site all materials in accordance with federal, state, and local guidelines, ordinances, and codes. C. The Contractor is responsible for collecting and transporting debris. All truck hauling must comply with State Department of Transportation regulations. After being loaded in the work area, truck loads shall be trimmed so that no debris extends horizontally beyond the bed in any direction. D. The Contractor shall completely remove below-grade construction, including foundation walls, footings, and walkways. Below-grade areas and voids resulting from demolition of the structure shall be graded to grade level. The Contractor shall ensure positive drainage away from the foundation area such that water does not pond in the newly filled locations. Prospective bidders who have questions regarding this Request for Proposals should email their questions to Barbara.Matthews@garrettparkmd.gov. The closing time for submission of questions is 4:30 p.m. on Thursday, May 4, 2023. All blanks on each and every form submitted in connection with the Request for Proposals must be filled in, and no change shall be made to the items described in the form. All Proposals must be signed in ink by the Proposer, with signature in full. Proposal must be good for 90 days. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |