Similar Projects
Oil and Gas Waste Stations
Infrastructure
Bidding
Less than $500,000 est. value
Key West, FL

Lake Park Harbor Marina Fuel Dispenser Replacement
Infrastructure
Bidding
West Palm Beach, FL 33403

Replace Fuel Tanks Patrick AFB FL
Post-Bid
$10,000,000 to $25,000,000 est. value
Cocoa Beach, FL 32931

Industrial Water Treatment Facility (IWTF) Tank Replacement
Post-Bid
Saint Petersburg, FL 33716

Jet A 15,000 Gallon Bottom Load Fuel Tank System
Results
Lake City, FL

Maintenance, Testing and Repairs of Fuel Systems
Term Contract
Results
Less than $2,700,000 est. value
Orlando, FL 32801

Seal and Coat Interior Chlorine Contact Chamber
Infrastructure
Bidding
$97,000 est. value
Port Charlotte, FL 33980

Assetworks Fuel System (Fuelfocus), Inspection and Repair
Term Contract
Post-Bid
Less than $95,000 est. value
West Palm Beach, FL 33415

Fuel Tank Repair at Brooksville Operations Center
Results
Brooksville, FL 34604

Fire Station 67 - Fuel Storage System
Infrastructure
Bidding
$145,000 est. value
Orlando, FL 32817

Northwest Water Reclamation Facility, Bleach Tank Replacement
Post-Bid
Saint Petersburg, FL 33710

Pre-Qualification of Vendors for Maintenance and Repair of Fuel Systems Equipment
Term Contract
Results
Less than $150,000 est. value
Belle Glade, Pahokee, West Palm Beach, FL

South Cross Bayou Digester Gas Flowmeter Installation
Infrastructure
Bidding
$564,200 est. value
Kenneth City, FL 33709

Diesel and Unleaded Fuel Polishing and Tank Cleaning
Post-Bid
Port Saint Lucie, FL

Fuel Dispensers Replacement
Results
Tallahassee, FL 32300

Last Updated 12/03/2021 08:09 AM
Project Title

Thomas C. Kelly Above Ground Fuel Storage Tank

Physical Address View project details and contacts
City, State (County) DeLand, FL   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New Double wall 1200 Gallon Underwriter Laboratories 2085 Steel Tank Institute Fireguard Storage Tank with an Overall Diameter of Approximately overall dimensions of 70 inches in diameter by 8 feet long

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents