Similar Projects
Watts-Midtown Library Book Shelves
Alteration
Bidding
Rock Island, IL 61201

RFI - Home Intrusion Detection Systems (CONUS/OCONUS)
Post-Bid

Fire Station Alerting System
Post-Bid
Moline, IL 61265

Building Automation System (BAS) Installation & Maintenance Enterprise-wide Services
Results

Telecommunications Infrastructure Testing Services - Worldwide
Results

High-Speed Fiber Optic Network
Post-Bid
Moline, IL

East Moline Public Library
Renovation, Addition
Results
East Moline, IL 52577

IP Backbone Circuit
Post-Bid
Rock Island, IL 61201

A 10Gb Ethernet Ip Backbone Circuit Between Bldg 350, Room 161, Telephone, Frame Room, 1St Floor, 2695 Rodman Avenue, Rock Island Arsenal, Rock Island, Il. 61299 And Bldg 1000, Room 222, Fl. Sl1, 900
Term Contract
Results
Rock Island, IL - Offutt AFB, Offutt Air Force Base, NE 61201

Central Station Alarm Monitoring (CSAM)
Post-Bid

10Gb Ethernet Ip Backbone Circuit
Term Contract
Results
Rock Island, Scott Air Force Base, IL 61201

Upgrades to Direct Digital Control System (DDCS)
Term Contract
Post-Bid
Rock Island, IL

2022 Elementary Structured Cabling
Alteration
Results
Moline, IL

East Moline Public Library - Furniture Bid Package
Alteration
Post-Bid
East Moline, IL 61244

2021 Moline PD AV System Upgrade
Alteration
Post-Bid
Moline, IL 61265

Last Updated 01/19/2022 05:31 PM
Project Title

Audio-Visual Systems

Physical Address View project details and contacts
City, State (County) Rock Island, IL 61201   (Rock Island County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Library - Public, Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All items must be installed and in proper working order within 2 weeks of opening day, currently projected as August 1, 2022, depending upon the construction schedule. Listed below are the rooms and items that are desired in those areas. 1. Study Rooms (2 Rooms) a. Crestron – 7 in. Room Scheduling Touch Screen (1 unit for each room) b. All technology, connections, software, and peripherals needed to ensure all installed items are properly functional c. On-site staff training for the installed system and any necessary, proprietary software d. Warranty e. Installation and setup of all listed items f. Any/other items needed to make this unit functional 2. Conference Room (1 Room) a. Crestron – 7 in. Room Scheduling Touch Screen b. Large TV with capabilities to connect to electronic devices c. Mounting hardware to mount large TV d. All technology, connections, software, and peripherals needed to properly transmit/mirror a computer/projects onto the installed TV e. On-site staff training for the installed system and any necessary, proprietary software f. Warranty g. Installation and setup of all listed items h. Any/other items needed to make this unit functional 3. Community Room (1 Room) a. Crestron – 7 in. Room Scheduling Touch Screen b. Short throw projector to be utilized in the large auditorium space, including any necessary lens needed to properly project the picture/video c. Backdrop for projector to be used within archway space (estimated usable space: 105” Height x 180” Width) d. DVD/Media Player for use with projector and sound system e. (2) Cordless hand-held mics that are compatible with the microphone and sound system f. Podium with microphone and sound system capability g. Surface mounted speaker system with amplifier, mixer, and any other necessary components h. All technology, connections, software, and peripherals needed to ensure all installed items are properly functional i. On-site staff training for the installed system and any necessary, proprietary software j. Installation and setup of all listed items k. Warranty l. Any/other items needed to make these units functional

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents