Similar Projects
Reported | 05/02/2020 12:00 AM |
Project Title | Staircase and Dumb Waiter for Reactor |
Physical Address | View project details and contacts |
City, State (County) | Picatinny Arsenal, NJ 07806 (Morris County) |
Category(s) | Single Trades |
Sub-Category(s) | Conveying Systems |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The U.S. Army Contracting Command – New Jersey, on behalf of U.S. Army Combat Capabilities Development Command – Armaments Center (CCDC AC), the Propulsion Technology and Prototyping Division at Picatinny Arsenal, NJ, is in need of contractor support to design, fabricate, and install stairs, platform, and a dumb waiter for the recently installed reactor which is approximately 3 feet deep, 5 feet wide, and 25 feet tall. The first platform fabricated will be approximately 7 feet off the ground and the second platform, 15 feet. Stairs are needed to access the platforms and a dumb waiter is needed to hoist chemicals from the floor to either platform as needed. Stairs and platforms are needed to operate the reactor in a safe manner acceptable to the chemical industry. The dumb waiter will be used for hoisting chemicals and equipment and must allow the operator from either platform to lift in place safely. The dumb waiter must be capable of hoisting a 5 gallon pail weighing 50 pounds. The stairs and platform must be fabricated of material, such as steel, that is conductive to prevent buildup of static electricity. The applicable NAICS code for this requirement is NAICS Code: 332323 Ornamental and Architectural Metal Work Manufacturing- Staircases, metal, manufacturing, with a Small Business Size Standard 500 in employees. The Product Service Code is 9540 Structural Shapes. Businesses of all sizes are encouraged to respond; however, each respondent must clearly identify their business size in their capabilities statement. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |